Study on the Model of Integrated Risk Management for BOT Projects

被引:0
|
作者
Jiang, Gongliang [1 ]
机构
[1] Chongqing Jiaotong Univ Chongqing, Sch Traff & Transportat, Chongqing 400074, Peoples R China
关键词
Engineering management; Risk Management; BOT; Model; Integrated;
D O I
10.4028/www.scientific.net/AMM.174-177.3374
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Build-Operate-Transfer (BOT) contracts have been increasingly adopting for large infrastructure projects. However, BUT contracts have been a very important model for the investing and building the basic establishment. In order to improve management level and risk management ability for BUT projects, the model of integrated risk management for BOT projects is discussed in this paper. The risk involved in each phase of the project is analyzed. This paper suggests methods to mitigate these risks and put forward the correlative management flow and risk management process system as well as support technology. The method and technique put forward by this paper would be used for risk management of BUT projects. And it is effective for improve risk management ability and reduce the risk in BUT projects.
引用
收藏
页码:3374 / 3377
页数:4
相关论文
共 50 条
  • [1] An integrated method for ranking of risk in BOT projects
    Askari, M.
    Shokrizade, H. R.
    [J]. 2ND WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT, 2014, 109 : 1390 - 1394
  • [2] An Integrated Risk Management Model for Construction Projects
    Zhao, Zhen-Yu
    Duan, Lin-Ling
    [J]. 2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1389 - 1394
  • [3] Risk Management in Turkish Transport BOT Projects
    Ozcan, Ismail Cagri
    [J]. EUROPEAN TRANSPORT-TRASPORTI EUROPEI, 2016, (62):
  • [4] Risk management of BOT projects in Southeast Asian countries
    Tam, CM
    Leung, AWT
    [J]. PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 499 - 507
  • [5] Positive management of differences for risk reduction in BOT projects
    Yeo, K.T.
    Tiong, Robert L.K.
    [J]. International Journal of Project Management, 2000, 18 (04) : 257 - 265
  • [6] Study of risk management of private enterprises' involvement in BOT projects: a case study of a sludge treatment project
    [J]. Sheng, H. (shenghetai@tsinghua.org.cn), 1600, Editorial Office of China Civil Engineering Journal (45):
  • [7] RISK MANAGEMENT FRAMEWORK FOR BUILD, OPERATE AND TRANSFER (BOT) PROJECTS IN KUWAIT
    Al-Azemi, Khalid Fahad
    Bhamra, Ran
    Salman, Ahmed F. M.
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (03) : 415 - 433
  • [8] The effect of concession period design on completion risk management of BOT projects
    Ye, Sudong
    Tiong, Robert L.K.
    [J]. 2003, Routledge (21)
  • [9] Integrated risk management process for building projects
    Toth, Tamas
    Sebestyen, Zoltan
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2014, 2014, 85 : 510 - 519
  • [10] Study on the Risk Management of Expressway BOT Project
    Wang Shufang
    Yang Chengzhong
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 84 - 88