Positive management of differences for risk reduction in BOT projects

被引:25
|
作者
Yeo, K.T. [1 ]
Tiong, Robert L.K. [2 ]
机构
[1] School of Mechanical and Production Engineering, Nanyang Technological University, Nanyang Avenue, 639798 Singapore, Singapore
[2] School of Civil and Structural Engineering, Nanyang Technological University, Nanyang Avenue, 639798 Singapore, Singapore
关键词
Build-operate-transfer (BOT) theory - Soft systems methodology (SSM);
D O I
10.1016/S0263-7863(99)00018-6
中图分类号
学科分类号
摘要
引用
收藏
页码:257 / 265
相关论文
共 50 条
  • [1] Risk Management in Turkish Transport BOT Projects
    Ozcan, Ismail Cagri
    [J]. EUROPEAN TRANSPORT-TRASPORTI EUROPEI, 2016, (62):
  • [2] Risk management of BOT projects in Southeast Asian countries
    Tam, CM
    Leung, AWT
    [J]. PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 499 - 507
  • [3] Study on the Model of Integrated Risk Management for BOT Projects
    Jiang, Gongliang
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3374 - 3377
  • [4] RISK MANAGEMENT FRAMEWORK FOR BUILD, OPERATE AND TRANSFER (BOT) PROJECTS IN KUWAIT
    Al-Azemi, Khalid Fahad
    Bhamra, Ran
    Salman, Ahmed F. M.
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (03) : 415 - 433
  • [5] The effect of concession period design on completion risk management of BOT projects
    Ye, Sudong
    Tiong, Robert L.K.
    [J]. 2003, Routledge (21)
  • [6] Price risk management in BOT railroad construction projects using financial derivatives
    Vahdatmanesh, Mohammad
    Firouzi, Afshin
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2018, 23 (03) : 349 - 362
  • [7] An integrated method for ranking of risk in BOT projects
    Askari, M.
    Shokrizade, H. R.
    [J]. 2ND WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT, 2014, 109 : 1390 - 1394
  • [8] Risk allocation in design-build and BOT projects
    Nielsen, KR
    [J]. CIVIL ENGINEERING IN THE ASIA REGION: ASIAN INFRASTRUCTURE, SUSTAINABLE DEVELOPMENT AND PROJECT MANAGEMENT, 1998, : 37 - 53
  • [9] Identifying risk factors of BOT for water supply projects
    Zeng, S. X.
    Wan, T. W.
    Tam, C. M.
    Liu, D.
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MANAGEMENT, 2008, 161 (02) : 73 - 81
  • [10] Study of risk management of private enterprises' involvement in BOT projects: a case study of a sludge treatment project
    [J]. Sheng, H. (shenghetai@tsinghua.org.cn), 1600, Editorial Office of China Civil Engineering Journal (45):