共 50 条
- [3] A Method of Identifying Supply Chain Risk Factors [J]. 2009 WRI WORLD CONGRESS ON SOFTWARE ENGINEERING, VOL 4, PROCEEDINGS, 2009, : 369 - +
- [5] Analyzing the risk factors of private-public partnerships for water supply projects using fuzzy synthetic evaluation: a case study of Iranian water supply projects [J]. WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, 2018, 18 (03): : 1005 - 1019
- [7] BOT CONTRACTS FOR WATER-SUPPLY [J]. WORLD WATER 89: MANAGING THE FUTURE - LEARNING FROM THE PAST, 1989, : 215 - 220
- [8] Risk Management in Turkish Transport BOT Projects [J]. EUROPEAN TRANSPORT-TRASPORTI EUROPEI, 2016, (62):
- [9] An integrated method for ranking of risk in BOT projects [J]. 2ND WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT, 2014, 109 : 1390 - 1394