Identifying risk factors of BOT for water supply projects

被引:16
|
作者
Zeng, S. X. [1 ]
Wan, T. W. [1 ]
Tam, C. M. [2 ]
Liu, D.
机构
[1] Shanghai Jiao Tong Univ, Antai Sch Management, Shanghai, Peoples R China
[2] City Univ Hong Kong, Dept Bldg & Construct, Kowloon, Hong Kong, Peoples R China
关键词
risk & probability analysis; water supply;
D O I
10.1680/wama.2008.161.2.73
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In China, urbanisation, industrialisation and increasing population are straining the existing infrastructure facilities, the shortage of which will suffocate economic growth and social development. In order to overcome the 'bottleneck', the Chinese government has explored the mechanism of the build-operation-transfer (BOT) model to encourage infrastructure provisions from the private sector. Using the analytic hierarchy process (AHP) technique, this paper constructs a three-level hierarchy for identifying the critical risk factors for water supply BOT projects in China. By comparing the 28 risk factors, the critical risk factors were short-listed and found to include 'change of taxation policy', 'fluctuation of loan interest rate', 'variation of water resources price', 'fluctuation of foreign exchange rates', 'competitors' and so on. Finally, strategies of risk management were proposed, including risk minimisation, risk transfer, risk allocation and risk retention.
引用
收藏
页码:73 / 81
页数:9
相关论文
共 50 条
  • [41] The effect of concession period design on completion risk management of BOT projects
    Ye, Sudong
    Tiong, Robert L.K.
    [J]. 2003, Routledge (21)
  • [42] Identifying Factors Affecting the Sustainability of Water Environment Treatment Public-Private Partnership Projects
    Li, Huimin
    Xia, Qing
    Wen, Shiping
    Wang, Lunyan
    Lv, Lelin
    [J]. ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [43] Identifying critical risk factors and responses of river dredging projects for knowledge management within organisation
    Chou, Jui-Sheng
    Chiu, Ying-Chen
    [J]. JOURNAL OF FLOOD RISK MANAGEMENT, 2021, 14 (01):
  • [44] Identifying the Key Risk Factors of Mega Infrastructure Projects from an Extended Sustainable Development Perspective
    Li, Yuanli
    Xiang, Pengcheng
    You, Kairui
    Guo, Jin
    Liu, Zhaowen
    Ren, Hong
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2021, 18 (14)
  • [45] BOT projects: Incentives and efficiency
    Qiu, Larry D.
    Wang, Susheng
    [J]. JOURNAL OF DEVELOPMENT ECONOMICS, 2011, 94 (01) : 127 - 138
  • [46] Standardization and testing of materials for water supply (projects)
    Kobus, E.J.M.
    Sollman, M.
    [J]. Water Supply, 1986, 4 (02): : 83 - 88
  • [47] Financial commitments for BOT projects
    Nanyang Technological Univ, Singapore
    [J]. Int J Proj Manage, 2 (73-78):
  • [48] Evaluation and analysis of BOT projects
    Skendrovic, Vladimir
    [J]. Gradevinar, 1998, 50 (06): : 319 - 327
  • [49] Applying TQM to major water supply projects
    Lavanchy, D
    [J]. JOURNAL AMERICAN WATER WORKS ASSOCIATION, 2001, 93 (10): : 58 - +
  • [50] Real Option in BOT projects
    Grisakova, Nora
    Kintler, Jakub
    [J]. MANAGING AND MODELLING OF FINANCIAL RISKS - 6TH INTERNATIONAL SCIENTIFIC CONFERENCE PROCEEDINGS, PTS 1 AND 2, 2012, : 180 - 185