FAULT LOCATION ON 11KV OVERHEAD LINES

被引:0
|
作者
BOWDEN, MH [1 ]
机构
[1] BOWDEN BROS LTD,BROMLEY,ENGLAND
来源
ELECTRICAL REVIEW | 1977年 / 201卷 / 19期
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:35 / 37
页数:3
相关论文
共 50 条
  • [31] Define the Limits of 11kV Motors Starting Current in Distribution Network
    Ashaar, Muhannad
    Jaber, Mahmoud
    Adel, Haithm
    [J]. 2018 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2018,
  • [32] The assessment of the appropriateness of 110 kV overhead lines
    Dvorsky, Emil
    Hejtmankova, Pavla
    [J]. PROCEEDINGS OF THE 14TH INTERNATIONAL SCIENTIFIC CONFERENCE ELECTRIC POWER ENGINEERING 2013, 2013, : 449 - 453
  • [33] Fault location method for partial coupling four-circuit overhead lines with different voltages
    Saber, Ahmed
    [J]. ELECTRICAL ENGINEERING, 2020, 102 (02) : 529 - 538
  • [34] A Hybrid Fault Location Method for Overhead Lines Combined with Underground Cables Using DWT and SVM
    Livani, Hanif
    Evrenosoglu, Cansin Yaman
    [J]. 2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [35] Design and development of an 11kV H-bridge multilevel STATCOM
    Betz, R. E.
    Cook, B. J.
    Summers, T. J.
    Palmer, R.
    Bastiani, A.
    Shao, S.
    Willis, K.
    [J]. 2007 AUSTRALASIAN UNIVERSITIES POWER ENGINEERING, VOLS 1-2, 2007, : 435 - +
  • [36] French overhead lines for 1.5 kV DC
    Schwach, Georg
    [J]. eb - Elektrische Bahnen, 2015, 113 (10): : 522 - 523
  • [37] Overhead lines fault location and arc voltage estimation numerical algorithm derived in time domain
    Djuric, MB
    Terzija, VV
    Radojevic, ZM
    [J]. ELECTRICAL ENGINEERING, 1998, 81 (01): : 45 - 53
  • [38] Fault location method for partial coupling four-circuit overhead lines with different voltages
    Ahmed Saber
    [J]. Electrical Engineering, 2020, 102 : 529 - 538
  • [39] INCREASING CAPACITY OF 33 KV OVERHEAD LINES
    MCPHERSON, JB
    [J]. ELECTRICAL REVIEW, 1971, 188 (11): : 339 - +
  • [40] Fault Location under CT Saturation for Overhead Transmission Lines Based on Asynchronous Measurements and ANNs
    Pustulka, Mateusz
    Lukowicz, Miroslaw
    [J]. 2014 POWER SYSTEMS COMPUTATION CONFERENCE (PSCC), 2014,