共 50 条
- [41] AUTOMATED START-UP TESTING OF NUCLEAR-POWER-PLANTS [J]. MECHANICAL ENGINEERING, 1987, 109 (02) : 87 - 90
- [42] COMBINED GAS-STEAM TURBINE POWER-STATION FOR DISTRICT HEATING IN UTRECHT [J]. BROWN BOVERI REVIEW, 1978, 65 (10): : 687 - 690
- [44] Optimization of the start-up procedure of a combined cycle power plant [J]. PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1841 - +
- [45] Effect of the intake temperature of gas turbine on the performance of gas-steam combined cycle power plant [J]. Huagong Jinzhan/Chemical Industry and Engineering Progress, 2020, 39 (11): : 4367 - 4374
- [48] A Feasibility Urban Power Network Black-start Scheme Based on Gas-Steam CCPP [J]. CURRENT DEVELOPMENT OF MECHANICAL ENGINEERING AND ENERGY, PTS 1 AND 2, 2014, 494-495 : 1723 - 1726
- [49] Study on Load Characteristics of Multiple Operation Modes of Gas-steam Combined Cycle Cogeneration Unit [J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2020, 40 (08): : 2587 - 2596
- [50] AUTOMATIC START-UP AND POWER CONTROL-SYSTEM FOR RESEARCH REACTORS [J]. SOVIET ATOMIC ENERGY-USSR, 1971, 31 (01): : 698 - &