OPTIMAL INVENTORY POLICY WITH MULTIPLE SET-UP COSTS

被引:71
|
作者
LIPPMAN, SA [1 ]
机构
[1] UNIV CALIF,GRAD SCH BUSINESS ADM,LOS ANGELES,CA
来源
MANAGEMENT SCIENCE SERIES A-THEORY | 1969年 / 16卷 / 01期
关键词
D O I
10.1287/mnsc.16.1.118
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:118 / 138
页数:21
相关论文
共 50 条
  • [21] Optimal excitation for identification of a cam set-up
    Demeulenaere, B
    Lampaert, V
    Swevers, J
    De Schutter, J
    NOISE AND VIBRATION ENGINEERING, VOLS 1 - 3, PROCEEDINGS, 2001, : 1209 - 1215
  • [22] STOCHASTIC SCHEDULING OF PARALLEL QUEUES WITH SET-UP COSTS
    DUENYAS, I
    VANOYEN, MP
    QUEUEING SYSTEMS, 1995, 19 (04) : 421 - 444
  • [23] OPTIMAL REPLACEMENT TIMES - A GENERAL SET-UP
    AVEN, T
    BERGMAN, B
    JOURNAL OF APPLIED PROBABILITY, 1986, 23 (02) : 432 - 442
  • [24] Multisite and multishift personnel planning with set-up costs
    Nearchou, A. C.
    Giannikos, I. C.
    Lagodimos, A. G.
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2020, 31 (01) : 5 - 31
  • [25] EXISTENCE OF DREZE EQUILIBRIUM UNDER SET-UP COSTS
    MADDEN, PJ
    JOURNAL OF ECONOMIC THEORY, 1984, 33 (02) : 275 - 288
  • [26] On the linear programming problem with fixed set-up costs
    Khang, DB
    FIRST INTERNATIONAL CONFERENCE ON OPERATIONS AND QUANTITATIVE MANAGEMENT, VOL 1 AND 2, 1997, : 40 - 47
  • [27] Implementing an optimal policy for set-up time reduction in an economic production quantity model
    Kreng, BW
    Wu, SY
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2000, 31 (05) : 605 - 612
  • [28] Priority index heuristic for multi-armed bandit problems with set-up costs and/or set-up time delays
    Dusonchet, F
    Hongler, MO
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2006, 19 (03) : 210 - 219
  • [29] INVENTORY PLANNING IN A DETERMINISTIC ENVIRONMENT - CONCAVE COST SET-UP
    BENSOUSSAN, A
    PROTH, JM
    LARGE SCALE SYSTEMS IN INFORMATION AND DECISION TECHNOLOGIES, 1984, 6 (02): : 177 - 184
  • [30] MULTIPLE SET-UP FLUTE MILLING PRACTICE
    不详
    MACHINERY AND PRODUCTION ENGINEERING, 1973, 122 (3149): : 411 - 411