OPTIMAL REPLACEMENT TIMES - A GENERAL SET-UP

被引:45
|
作者
AVEN, T
BERGMAN, B
机构
[1] LINKOPING INST TECHNOL,S-58188 LINKOPING,SWEDEN
[2] UNIV OSLO,OSLO 3,NORWAY
关键词
D O I
10.2307/3214185
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
引用
收藏
页码:432 / 442
页数:11
相关论文
共 50 条
  • [1] OPTIMAL CYCLE TIMES IN MULTISTAGE SERIAL SYSTEMS WITH SET-UP AND INVENTORY COSTS
    KARIMI, IA
    MANAGEMENT SCIENCE, 1992, 38 (10) : 1467 - 1481
  • [2] An effective heuristic for the CLSP with set-up times
    Hindi, KS
    Fleszar, K
    Charalambous, C
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (05) : 490 - 498
  • [3] Workholding jaws will bite into set-up times
    不详
    PROFESSIONAL ENGINEERING, 2003, 16 (04) : 55 - 55
  • [4] PREPARED SETTING REDUCES SET-UP TIMES
    SCHMID, K
    F&M-FEINWERKTECHNIK & MESSTECHNIK, 1990, 98 (09): : S70 - &
  • [5] A HEURISTIC FOR PREEMPTIVE SCHEDULING WITH SET-UP TIMES
    WOGINGER, GJ
    YU, Z
    COMPUTING, 1992, 49 (02) : 151 - 158
  • [6] Set-up times are reduced for rubber processing
    Fischer, David L.
    Rubber World, 2010, 243 (03): : 14 - 15
  • [7] Faster set-up times & higher productivity
    Machinery, 2022, 180 (4314):
  • [8] Optimal set-up of industrial scheduling software
    Talbi, D
    Geneste, L
    Grabot, B
    Prévitali, R
    Hostachy, P
    COLLABORATIVE SYSTEMS FOR PRODUCTION MANAGEMENT, 2003, 129 : 561 - 572
  • [9] Optimal combined set-up and calibration policy
    Ladany, Shaul P., 1600, (09):
  • [10] OPTIMAL SET-UP POLICY FOR CONTROL CHARTS
    LADANY, SP
    ALPEROVITCH, Y
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1975, 3 (01): : 113 - 118