Finance-based scheduling using meta-heuristics: discrete versus continuous optimization problems

被引:15
|
作者
Elazouni, Ashraf [1 ]
Alghazi, Anas [2 ]
Selim, Shokri [2 ]
机构
[1] King Fahd Univ Petr & Minerals, Engn & Management Dept, Dhahran, Saudi Arabia
[2] King Fahd Univ Petr & Minerals, Syst Engn Dept, Dhahran, Saudi Arabia
关键词
Financial management; Project scheduling;
D O I
10.1108/JFMPC-07-2014-0013
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose - The purpose of this paper is to compare the performance of the genetic algorithm (GA), simulate annealing (SA) and shuffled frog-leaping algorithm (SFLA) in solving discrete versus continuous-variable optimization problems of the finance-based scheduling. This involves the minimization of the project duration and consequently the time-related cost components of construction contractors including overheads, finance costs and delay penalties. Design/methodology/approach - The meta-heuristics of the GA, SA and SFLA have been implemented to solve non-deterministic polynomial-time hard (NP-hard) finance-based scheduling problem employing the objective of minimizing the project duration. The traditional problem of generating unfeasible solutions in scheduling problems is adequately tackled in the implementations of the meta-heuristics in this paper. Findings - The obtained results indicated that the SA outperformed the SFLA and GA in terms of the quality of solutions as well as the computational cost based on the small-size networks of 30 activities, whereas it exhibited the least total duration based on the large-size networks of 120 and 210 activities after prolonged processing time. Research limitations/implications - From researchers' perspective, finance-based scheduling is one of the few domain problems which can be formulated as discrete and continuous-variable optimization problems and, thus, can be used by researchers as a test bed to give more insight into the performance of new developments of meta-heuristics in solving discrete and continuous-variable optimization problems. Practical implications - Finance-based scheduling discrete-variable optimization problem is of high relevance to the practitioners, as it allows schedulers to devise finance-feasible schedules of minimum duration. The minimization of project duration is focal for the minimization of time-related cost components of construction contractors including overheads, finance costs and delay penalties. Moreover, planning for the expedient project completion is a major time-management aspect of construction contractors towards the achievement of the objective of client satisfaction through the expedient delivery of the completed project for clients to start reaping the anticipated benefits. Social implications - Planning for the expedient project completion is a major time-management aspect of construction contractors towards the achievement of the objective of client satisfaction. Originality/value - SFLA represents a relatively recent meta-heuristic that proved to be promising, based on its limited number of applications in the literature. This paper is to implement SFLA to solve the discrete-variable optimization problem of the finance-based scheduling and assess its performance by comparing its results against those of the GA and SA.
引用
收藏
页码:85 / +
页数:21
相关论文
共 50 条
  • [41] Discrete Krill Herd Algorithm - A Bio-Inspired Meta-Heuristics for Graph Based Network Route Optimization
    Sur, Chiranjib
    Shukla, Anupam
    DISTRIBUTED COMPUTING AND INTERNET TECHNOLOGY, ICDCIT 2014, 2014, 8337 : 152 - 163
  • [42] Ensemble meta-heuristics and Q-learning for solving unmanned surface vessels scheduling problems
    Gao, Minglong
    Gao, Kaizhou
    Ma, Zhenfang
    Tang, Weiyu
    SWARM AND EVOLUTIONARY COMPUTATION, 2023, 82
  • [43] Q-Learning-Assisted Meta-Heuristics for Scheduling Distributed Hybrid Flow Shop Problems
    Zhu, Qianyao
    Gao, Kaizhou
    Huang, Wuze
    Ma, Zhenfang
    Slowik, Adam
    CMC-COMPUTERS MATERIALS & CONTINUA, 2024, 80 (03): : 3573 - 3589
  • [44] GA-based multi-objective optimization of finance-based construction project scheduling
    Habib Fathi
    Abbas Afshar
    KSCE Journal of Civil Engineering, 2010, 14 : 627 - 638
  • [45] GA-based multi-objective optimization of finance-based construction project scheduling
    Fathi, Habib
    Afshar, Abbas
    KSCE JOURNAL OF CIVIL ENGINEERING, 2010, 14 (05) : 627 - 638
  • [46] Finance-based scheduling for projects in owners' portfolios: MILP versus improved GA and PSO
    Fares, Ali
    Elazouni, Ashraf
    Al-Shihabi, Sameh
    Al-Alawi, Mubarak
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [47] Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost
    Afshar, Abbas
    Fathi, Habib
    ENGINEERING OPTIMIZATION, 2009, 41 (11) : 1063 - 1080
  • [48] Multi-objective optimization for the multi-mode finance-based project scheduling problem
    Al-Shihabi, Sameh
    Aldurgam, Mohammad
    FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (02) : 223 - 237
  • [49] Solving Heterogeneous USV Scheduling Problems by Problem-Specific Knowledge Based Meta-Heuristics with Q-Learning
    Ma, Zhenfang
    Gao, Kaizhou
    Yu, Hui
    Wu, Naiqi
    MATHEMATICS, 2024, 12 (02)
  • [50] Solving Optimization Problems of Metamaterial and Double T-Shape Antennas Using Advanced Meta-Heuristics Algorithms
    Khafaga, Doaa Sami
    Alhussan, Amel Ali
    El-Kenawy, El-Sayed M.
    Ibrahim, Abdelhameed
    Eid, Marwa Metwally
    Abdelhamid, Abdelaziz A.
    IEEE ACCESS, 2022, 10 : 74449 - 74471