GA-based multi-objective optimization of finance-based construction project scheduling

被引:40
|
作者
Fathi, Habib [1 ]
Afshar, Abbas [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Civil Engn, Tehran 16846, Iran
关键词
financial management; cash flow; multi-objective optimization; genetic algorithm; construction management; financial decisions making; TIME-COST OPTIMIZATION; IMPROVED GENETIC ALGORITHMS; CASH-FLOW;
D O I
10.1007/s12205-010-0849-2
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
From a financial management perspective, the profitability of a construction project is connected to the cash requirements of the project and the ability of a company to procure cash at the right time. Line of credit as a bank credit agreement provides an alternative way of managing the necessary capital and cash flow for the project. Today's highly competitive business environment necessitates comprehensive scheduling with respect to cash providing provisions and restrictions. This paper presents a multi-objective elitist Non-dominated Sorting Genetic Algorithm (NSGA-II) based optimization model for finance-based scheduling which facilitates the decision making process of the most appropriate line of credit option for cash procurement. Finance-based scheduling modifies the initial schedule of the project so that its maximum negative cash flow is limited to a specific credit limit. Furthermore, this paper suggests several improvements to basic NSGA-II and demonstrates how they significantly enhance the efficiency of the model in searching for non-dominated solutions. The proposed model is validated by a designed benchmark problem, and its performance and merits are illustrated through its application to a case example. It is shown that the model can effectively approach to the optimal Pareto set and maintain diversity in solutions.
引用
收藏
页码:627 / 638
页数:12
相关论文
共 50 条
  • [1] GA-based multi-objective optimization of finance-based construction project scheduling
    Habib Fathi
    Abbas Afshar
    [J]. KSCE Journal of Civil Engineering, 2010, 14 : 627 - 638
  • [2] Multi-objective optimization for the multi-mode finance-based project scheduling problem
    Al-Shihabi, Sameh
    Aldurgam, Mohammad
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (02) : 223 - 237
  • [3] Multi-objective optimization for the multi-mode finance-based project scheduling problem
    Sameh Al-Shihabi
    Mohammad Aldurgam
    [J]. Frontiers of Engineering Management, 2020, 7 : 223 - 237
  • [4] Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost
    Afshar, Abbas
    Fathi, Habib
    [J]. ENGINEERING OPTIMIZATION, 2009, 41 (11) : 1063 - 1080
  • [5] Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms
    El-Abbasy, Mohammed S.
    Elazouni, Ashraf
    Zayed, Tarek
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 120
  • [6] GA-based multi-objective optimization
    Li, MQ
    Kou, JS
    Dai, L
    [J]. PROCEEDINGS OF THE 3RD WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-5, 2000, : 637 - 640
  • [7] A NOVEL MULTI-OBJECTIVE FINANCE-BASED SCHEDULING PROBLEM CONSIDERING MULTIPLE SOURCES OF FINANCE
    Hoseini-Androod, S.
    Bamdad, S.
    [J]. LATIN AMERICAN APPLIED RESEARCH, 2022, 52 (04) : 303 - 312
  • [8] Finance-based Scheduling for Cash-flow Management of Maintenance Portfolios: Multi-objective Optimization Approach
    Department of Civil and Architectural Engineering, Sultan Qaboos University, Al-Khoud 123, Muscat, Oman
    [J]. Decis. Mak.: Appl. in Manag. Eng., 2024, 2 (355-379):
  • [9] Heuristic method for multi-project finance-based scheduling
    Elazouni, Ashraf
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (02) : 199 - 211
  • [10] A bi-objective optimization for finance-based and resource-constrained robust project scheduling
    Liu, Wanlin
    Zhang, Jingwen
    Liu, Cuifang
    Qu, Chunli
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2023, 231