RESOURCE INVESTMENT PROBLEM WITH DISCOUNTED CASH FLOWS

被引:0
|
作者
Najafi, Amir Abbas [1 ]
Niaki, Seyed Taghi Akhavan [1 ]
机构
[1] Sharif Univ Technol, Dept Ind Engn, POB 11365-9414,Azadi Ave, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2005年 / 18卷 / 01期
关键词
Project Scheduling; Resource Investment; Net Present Value; Heuristic Methods;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered decision variables and the goal is to find a schedule and resource requirement levels such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash flows. We call this problem as Resource Investment Problem with Discounted Cash Flows (RIPDCF) and we develop a heuristic method to solve it. Results of several numerical examples show that the proposed method performs relatively well.
引用
收藏
页码:51 / 62
页数:12
相关论文
共 50 条
  • [1] A genetic algorithm for resource investment problem with discounted cash flows
    Najafi, Amir Abbas
    Niaki, Seyed Taghi A.
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2006, 183 (02) : 1057 - 1070
  • [2] A Differential Evolution Algorithm for the Resource Investment Problem with Discounted Cash Flows
    Liu, Meining
    Liu, Jing
    Hao, Xingxing
    [J]. 2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 1554 - 1559
  • [3] Solution procedure for generalized resource investment problem with discounted cash flows and progress payment
    Afshar-Nadjafi, B.
    Parsanejad, A.
    Hajipour, V.
    Nobari, A.
    [J]. SCIENTIA IRANICA, 2014, 21 (06) : 2436 - 2447
  • [4] A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
    Najafi, Amir Abbas
    Niaki, Seyed Taghi Akhavan
    Shahsavar, Moslem
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) : 2994 - 3001
  • [5] Multiobjective model for solving resource-leveling problem with discounted cash flows
    Abadi, Niloofar Nikoofal Sahl
    Bagheri, Mohsen
    Assadi, Mohammad
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2018, 25 (06) : 2009 - 2030
  • [6] A Priority Rule-Based Heuristic for Resource Investment Project Scheduling Problem with Discounted Cash Flows and Tardiness Penalties
    Najafi, Amir Abbas
    Azimi, Fatemeh
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2009, 2009
  • [7] Resource constrained project scheduling and material ordering problem with discounted cash flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [8] A TABU SEARCH PROCEDURE FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS
    ICMELI, O
    ERENGUC, SS
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (08) : 841 - 853
  • [9] An Immune Genetic Algorithm for Resource Constrained Project Scheduling Problem with Discounted Cash Flows
    Asadujjaman, Md
    Rahman, Humyun Fuad
    Chakrabortty, Ripon Kumar
    Ryan, Michael J.
    [J]. 2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 1179 - 1183
  • [10] A branch and bound procedure for the resource constrained project scheduling problem with discounted cash flows
    Icmeli, O
    Erenguc, SS
    [J]. MANAGEMENT SCIENCE, 1996, 42 (10) : 1395 - 1408