共 50 条
- [31] Estimation of the life cycle cost of the upper railway track structure [J]. X INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE POLYTRANSPORT SYSTEMS, 2018, 216
- [32] Cost Estimation of Project Based on Principal Component Analysis [J]. ICOSCM 2009 - PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT, 2009, 3 : 708 - 711
- [34] HOSPITALIZATION COST ESTIMATION MODEL USING A MULTILEVEL ANALYSIS [J]. VALUE IN HEALTH, 2017, 20 (05) : A372 - A372
- [35] CLUSTER-ANALYSIS AS STRUCTURE-ANALYSIS [J]. INTERNATIONAL CLASSIFICATION, 1989, 16 (01): : 15 - 23
- [36] Cost estimation and analysis for government contract pricing in China [J]. SOFTWARE PROCESS DYNAMICS AND AGILITY, PROCEEDINGS, 2007, 4470 : 134 - +
- [37] Mask cost analysis via wirite time estimation [J]. Design and Process Integration for Microelectronic Manufacturing III, 2005, 5756 : 313 - 318
- [38] POLYMER CHARACTERIZATION AND STRUCTURE-ANALYSIS [J]. ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1974, : 16 - 16
- [39] NEW APPROACHES TO STRUCTURE-ANALYSIS [J]. ACTA CRYSTALLOGRAPHICA SECTION B-STRUCTURAL SCIENCE, 1995, 51 : 411 - 415