HOSPITALIZATION COST ESTIMATION MODEL USING A MULTILEVEL ANALYSIS

被引:0
|
作者
Prada, Romero M. E. [1 ]
Celis, S. [1 ]
Acero, G. [1 ]
Gallo, D. [1 ]
Cruz, A. M. [2 ]
机构
[1] Salutia Fdn, Res Ctr Econ Management & Hlth Technol, Bogota, Colombia
[2] Coomeva EPS, Cali, Colombia
关键词
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
PHS141
引用
下载
收藏
页码:A372 / A372
页数:1
相关论文
共 50 条
  • [1] Multilevel model analysis using R
    Jula, Nicolae-Marius
    ROMANIAN STATISTICAL REVIEW, 2014, (02) : 55 - 66
  • [2] Cost-Benefit Analysis of Cloud Computing in Education Using the Base Cost Estimation Model
    Salindeho, Jannice Felicia
    Moedjahedy, Jimmy H.
    Lengkong, Oktoverano
    3RD INTERNATIONAL CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS (ICORIS 2021), 2021, : 711 - 715
  • [3] MULTIPLE-REGRESSION HOSPITALIZATION-COST MODEL FOR PHARMACY COST-ANALYSIS
    PHILLIPS, MS
    BRADHAM, DD
    WILLIAMS, RB
    PETRY, ML
    AMERICAN JOURNAL OF HOSPITAL PHARMACY, 1986, 43 (03): : 676 - 681
  • [4] Bayesian estimation of a multilevel IRT model using gibbs sampling
    Jean-Paul Fox
    Cees A. W. Glas
    Psychometrika, 2001, 66 : 271 - 288
  • [5] Bayesian estimation of a multilevel IRT model using Gibbs sampling
    Fox, JP
    Glas, CAW
    PSYCHOMETRIKA, 2001, 66 (02) : 271 - 288
  • [6] Estimation of the hospitalization cost for asthma exacerbation in a pulmonology department
    Hamdi, Besma
    Bdira, Baraa
    Akaad, Alaa
    Abdelmoulah, Khouloud
    Ammar, Jammel
    Berraies, Anissa
    Hamzaoui, Agnes
    EUROPEAN RESPIRATORY JOURNAL, 2017, 50
  • [7] Development of a Maintenance and Repair Cost Estimation Model for Educational Buildings Using Regression Analysis
    Kim, Ji-Myong
    Kim, Taehui
    Yu, Yeong-Jin
    Son, Kiyoung
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2018, 17 (02) : 307 - 312
  • [8] Experimental Analysis of Geopolymer Concrete: A Sustainable and Economic Concrete Using the Cost Estimation Model
    Verma, Manvendra
    Upreti, Kamal
    Vats, Prashant
    Singh, Sandeep
    Singh, Prashant
    Dev, Nirendra
    Kumar Mishra, Durgesh
    Tiwari, Basant
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2022, 2022
  • [9] Estimation of brain electrical sources using multilevel source space model
    An, Kwang-Ok
    Im, Chang-Hwan
    Jung, Ki-Young
    Park, Ji-Hwan
    Jung, Hyun-Kyo
    IEEE TRANSACTIONS ON MAGNETICS, 2007, 43 (04) : 1697 - 1700
  • [10] Decommissioning Cost Estimation of Kori Unit 1 Using a Multi-Regression Analysis Model
    Joo, Han Young
    Kim, Jae Wook
    Jeong, So Yun
    Moon, Joo Hyun
    JOURNAL OF NUCLEAR FUEL CYCLE AND WASTE TECHNOLOGY, 2020, 18 (2E): : 247 - 260