Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm

被引:11
|
作者
Xie, Wei [1 ]
Ji, Chang-ming [1 ]
Yang, Zi-jun [2 ]
Zhang, Xiao-xing [3 ]
机构
[1] North China Elect Power Univ, Beijing Key Lab New & Renewable Energy, Beijing 102206, Peoples R China
[2] Hydrochina Kunming Engn Corp, Kunming 650051, Yunnan, Peoples R China
[3] Jinsha River Hydropower Dev Co Ltd, Kunming 650228, Yunnan, Peoples R China
关键词
scheduling rule; short-time power generation dispatching; hybrid algorithm; cascade hydropower station;
D O I
10.3882/j.issn.1674-2370.2012.01.005
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.
引用
收藏
页码:46 / 58
页数:13
相关论文
共 50 条
  • [2] Discussion on the short-term weekly optimal scheduling of cascade hydropower stations
    Li, Liang
    Zhou, Yun
    Huang, Qiang
    [J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (04): : 38 - 42
  • [3] Study of the scheduling rules of short-term power generation dispatching for single hydropower station
    Ji, Chang-ming
    Xie, Wei
    Yang, Zi-jun
    Zhang, Xiao-xing
    Zhu, Xin-liang
    [J]. 2012 INTERNATIONAL CONFERENCE ON INDUSTRIAL CONTROL AND ELECTRONICS ENGINEERING (ICICEE), 2012, : 1412 - 1416
  • [4] Optimal short-term operation of a cascade of hydropower stations
    Wolf, AJ
    Lindberg, PO
    [J]. HYDRAULIC ENGINEERING SOFTWARE VI, 1996, : 215 - 221
  • [5] Short-term hydro generation operation of cascade hydropower stations in Han River, China
    Zhang, Rui
    Wang, Xuemin
    Yu, Shan
    Zou, Qiang
    [J]. 2018 3RD ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2018), 2018, 366
  • [6] Short-Term Joint Optimization of Cascade Hydropower Stations on Daily Power Load Curve
    Yuan, Liu
    Zhou, Jianzhong
    Chang, Chuyang
    Lu, Peng
    Wang, Chao
    Tayyab, Muhammad
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON KNOWLEDGE ENGINEERING AND APPLICATIONS (ICKEA 2016), 2016, : 236 - 240
  • [7] Study on Generation Scheduling of Cascade Hydropower Stations Based on SAPSO
    Yi, Min
    Mo, Li
    Shen, Qin
    [J]. JOURNAL OF COASTAL RESEARCH, 2020, : 371 - 378
  • [8] Short-term Scheduling Algorithm of Hydropower Cascade System Adapted to Different Optimization Models
    Zhang, Gaofeng
    Zheng, Hao
    Liu, Shuangquan
    Wang, Jinwen
    [J]. Dianwang Jishu/Power System Technology, 2020, 44 (01): : 230 - 237
  • [9] SUCCESSIVE APPROXIMATION ALGORITHM BASED ON IMPROVED SHORT-TERM OPTIMAL DISPATCHING OF CASCADE HYDROPOWER STATIONS AND SOFTWARE DEVELOPMENT
    Li Shihui
    Li Yanpin
    Zhao Di
    [J]. JOURNAL OF THE BALKAN TRIBOLOGICAL ASSOCIATION, 2016, 22 (2A): : 1899 - 1912
  • [10] A Practical Short-term Scheduling Model for Cascade Hydropower Reservoirs
    Feng, Yu
    Zhong, Jian
    Lu, Peng
    [J]. FRONTIERS OF MANUFACTURING SCIENCE AND MEASURING TECHNOLOGY V, 2015, : 1269 - 1276