SUCCESSIVE APPROXIMATION ALGORITHM BASED ON IMPROVED SHORT-TERM OPTIMAL DISPATCHING OF CASCADE HYDROPOWER STATIONS AND SOFTWARE DEVELOPMENT

被引:0
|
作者
Li Shihui [1 ,2 ]
Li Yanpin [3 ]
Zhao Di [2 ]
机构
[1] Xian Univ Technol, Fac Water Resources & Hydroelect Engn, Xian 710048, Shaanxi, Peoples R China
[2] Yellow River Engn Consulting Co Ltd, Inst City Environm Hydraul Planning & Designing, Zhengzhou 450000, Henan, Peoples R China
[3] North China Univ Water Resources & Elect Power, Sch Elect Power, Zhengzhou 450011, Henan, Peoples R China
来源
关键词
cascade hydropower stations; short-term optimal scheduling; successive approximation algorithm for improvement; OPTIMIZATION; SYSTEMS;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Short-term optimal scheduling model for cascade hydropower stations was established, and the improved successive approximation algorithm was used to calculate the model, combined with the time-sharing electricity, traffic delay and power station actual needed, set up economic benefit maximization model of cascade hydropower stations, and developed the corresponding calculation software. Take cascade hydropower stations in Fu-Jiang river as the research object, through calculation, the optimization scheduling solution can be got quickly and reasonable. Compared with the regular schedule, the economic benefit is improved obviously. Results show that the algorithm convergence is good, operation efficiency and high accuracy, practical and effective in the actual production, to meet the demand of the optimization scheduling of cascade hydropower stations.
引用
收藏
页码:1899 / 1912
页数:14
相关论文
共 50 条
  • [1] Optimal short-term operation of a cascade of hydropower stations
    Wolf, AJ
    Lindberg, PO
    [J]. HYDRAULIC ENGINEERING SOFTWARE VI, 1996, : 215 - 221
  • [2] Discussion on the short-term weekly optimal scheduling of cascade hydropower stations
    Li, Liang
    Zhou, Yun
    Huang, Qiang
    [J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (04): : 38 - 42
  • [3] Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm
    Xie, Wei
    Ji, Chang-ming
    Yang, Zi-jun
    Zhang, Xiao-xing
    [J]. WATER SCIENCE AND ENGINEERING, 2012, 5 (01) : 46 - 58
  • [5] Study of Optimal Operation of Cascade Hydropower Stations Based on an Improved Particle Swarm Algorithm
    Zhang, Ming
    Shi, Sha
    Wu, Jingxiu
    Fan, Ziwu
    Wang, Yingying
    [J]. PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013,
  • [6] A Short-term Joint Optimal Dispatching Method of Wind Farms, Photovoltaic Generations, Hydropower Stations and Gas Power Plants
    Chen Tian-qiong
    Li Geng-yin
    [J]. 2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2014, : 890 - 896
  • [7] Study on short-term peak load of Xiaolangdi and Xixiayuan cascade hydropower stations
    Bai, Tao
    Chang, Jianxia
    Fang, Jianxi
    Huang, Qiang
    Zhu, Xuping
    Liao, Xinyu
    [J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2012, 31 (04): : 83 - 88
  • [8] An Improved Slime Mold Algorithm and its Application for Optimal Operation of Cascade Hydropower Stations
    Nguyen, Trong-The
    Wang, Hong-Jiang
    Dao, Thi-Kien
    Pan, Jeng-Shyang
    Liu, Jian-Hua
    Weng, Shaowei
    [J]. IEEE ACCESS, 2020, 8 : 226754 - 226772
  • [9] Study on optimization of the short-term operation of cascade hydropower stations by considering output error
    Wang, Liping
    Wang, Boquan
    Zhang, Pu
    Liu, Minghao
    Li, Chuangang
    [J]. JOURNAL OF HYDROLOGY, 2017, 549 : 326 - 339
  • [10] Short-term hydro generation operation of cascade hydropower stations in Han River, China
    Zhang, Rui
    Wang, Xuemin
    Yu, Shan
    Zou, Qiang
    [J]. 2018 3RD ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2018), 2018, 366