Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm

被引:11
|
作者
Xie, Wei [1 ]
Ji, Chang-ming [1 ]
Yang, Zi-jun [2 ]
Zhang, Xiao-xing [3 ]
机构
[1] North China Elect Power Univ, Beijing Key Lab New & Renewable Energy, Beijing 102206, Peoples R China
[2] Hydrochina Kunming Engn Corp, Kunming 650051, Yunnan, Peoples R China
[3] Jinsha River Hydropower Dev Co Ltd, Kunming 650228, Yunnan, Peoples R China
关键词
scheduling rule; short-time power generation dispatching; hybrid algorithm; cascade hydropower station;
D O I
10.3882/j.issn.1674-2370.2012.01.005
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.
引用
收藏
页码:46 / 58
页数:13
相关论文
共 50 条
  • [21] A Hybrid Cultural Algorithm Based on Clonal Selection Principle for Optimal Generation Scheduling of Cascaded Hydropower Stations
    Qin, Hui
    Li, Qingqing
    Hong, Xiaofeng
    [J]. PROCEEDINGS 2013 INTERNATIONAL CONFERENCE ON MECHATRONIC SCIENCES, ELECTRIC ENGINEERING AND COMPUTER (MEC), 2013, : 124 - 130
  • [22] Quantifying streamflow predictive uncertainty for the optimization of short-term cascade hydropower stations operations
    Liu, Yuan
    Ji, Changming
    Wang, Yi
    Zhang, Yanke
    Hou, Xiaoning
    Xie, Yutao
    [J]. JOURNAL OF HYDROLOGY, 2022, 605
  • [23] Application of Short-Term Hydropower Generation Scheduling in a Hydropower Station Based on Improved Binary -Real-Coded Shuffled Frog Leaping Algorithm
    Yang, Zhe
    Yang, Kan
    Wu, Yun
    Xia, Yi
    Qi, Weiqing
    Zhang, Tianyan
    Zhong, Xiaolin
    [J]. Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2019, 52 (09): : 979 - 989
  • [24] GENETIC ALGORITHM BASED SHORT-TERM SCHEDULING OF REACTIVE POWER CONTROLLERS
    Shaheen, Husam
    Ma, Jia
    Cheng, Shijie
    [J]. ISTANBUL UNIVERSITY-JOURNAL OF ELECTRICAL AND ELECTRONICS ENGINEERING, 2005, 5 (02): : 1419 - +
  • [25] Short-Term Power Generation Energy Forecasting Model for Small Hydropower Stations Using GA-SVM
    Li, Gang
    Sun, Yongjun
    He, Yong
    Li, Xiufeng
    Tu, Qiyu
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [26] Research on short-term multi-level and multi-objective optimal scheduling of cascade hydropower stations under complex water resources and power constraints
    Wen, Xin
    Liu, Fanqian
    Tan, Qiaofeng
    Wang, Hao
    [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2023, 54 (04): : 392 - 404
  • [27] Short-term optimal scheduling of cascade hydropower plants with reverse-regulating effects
    Su, Chengguo
    Wang, Peilin
    Yuan, Wenlin
    Wu, Yang
    Jiang, Feng
    Wu, Zening
    Yan, Denghua
    [J]. RENEWABLE ENERGY, 2022, 199 : 395 - 406
  • [28] A short-term scheduling for a hydropower plant chain
    Pursimo, JM
    Antila, HK
    Vilkko, MK
    Lautala, PA
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1998, 20 (08) : 525 - 532
  • [29] Short-term Robust Optimization Scheduling of Cascade Hydropower Stations Coupled With Daily Contract Decomposition and Day-ahead Market Bidding
    Yu, Xuguang
    Li, Gang
    Li, Yapeng
    Wang, Bangcan
    Cheng, Chuntian
    [J]. Dianwang Jishu/Power System Technology, 2021, 45 (10): : 4016 - 4024
  • [30] Short-term scheduling methods for peak load responding demand of cascade hydropower stations in small and medium-sized river basins
    Cheng, Xiong
    Chen, Qingning
    Li, Xianshan
    Peng, Hui
    Zhong, Hao
    Li, Wenwu
    [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2023, 54 (02): : 159 - 171