摘要
Evaluating to what extent a component or building system should be produced off-site is inadequate within the industry. The potential benefits of off-site production (OSP) are commonly cited when justifying an OSP approach, yet holistic and methodical assessments of the applicability and overall benefit of these solutions, to a particular project, have been found to be deficient. Common methods of evaluation simply take material, labour and transportation costs into account when comparing various options, often disregarding other costrelated items such as site facilities, crane use and rectification of works. These cost factors are usually buried within the nebulous preliminaries figure, with little reference to the building approach taken. Further, softer issues such as health and safety, effects on management and process benefits are either implicit or disregarded within these comparison exercises. Yet it is demonstrated that these issues are some of the most significant benefits of OSP. A series of case studies demonstrated that evaluation focus is almost solely on direct material and labour costs of components, without explicit regard for the wider cost or soft issue implications of OSP on a project. The paper argues that until evaluation is more holistic and value-based rather than cost-based, OSP uptake in construction will be slow.
引用
收藏
页码:121 / 130
页数:10
相关论文
共 50 条
  • [1] Synchronising Off-Site Fabrication with On-Site Production in Construction
    Mossman, Alan
    Sarhan, Saad
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2021, 21 (03): : 122 - 141
  • [2] Constraints to the Use of Off-site Production on Construction Projects
    Blismas, Nick G.
    Pendlebury, Martyn
    Gibb, Alistair
    Pasquire, Christine
    [J]. ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2005, 1 (03) : 153 - 162
  • [3] Steel and off-site construction
    [J]. Structural Engineer, 2020, 98 (06): : 24 - 27
  • [4] Autonomous production tracking for augmenting output in off-site construction
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Maqsood, Tayyab
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 53 : 13 - 21
  • [5] Critical evaluation of off-site construction research: A Scientometric analysis
    Hosseini, M. Reza
    Martek, Igor
    Zavadskas, Edmundas Kazimieras
    Aibinu, Ajibade A.
    Arashpour, Mehrdad
    Chileshe, Nicholas
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 87 : 235 - 247
  • [6] Cybersecurity Vulnerabilities in Off-Site Construction
    Nyamuchiwa, Kudakwashe
    Lei, Zhen
    Aranas, Clodualdo, Jr.
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (10):
  • [7] Knowledge management for off-site construction
    Zhang, Zhen
    Zou, Yang
    Guo, Brian H. W.
    Dimyadi, Johannes
    Davies, Roy
    Jiang, Lixin
    [J]. AUTOMATION IN CONSTRUCTION, 2024, 166
  • [8] Off-Site Construction of Apartment Buildings
    Boyd, Neville
    Khalfan, Malik M. A.
    Maqsood, Tayyab
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2013, 19 (01) : 51 - 57
  • [9] Special Issue on Off-Site Construction
    Arif, Mohammed
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2012, 18 (02)
  • [10] BIM Standard in Off-Site Construction
    Nawari, Nawari O.
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2012, 18 (02)