Economics of on-site vs. off-site fabrication of rebar

被引:22
|
作者
Polat, Gul [1 ]
Arditi, David [2 ]
Ballard, Glenn [3 ]
Mungen, Ugur [1 ]
机构
[1] Istanbul Tech Univ, Fac Civil Engn, Istanbul, Turkey
[2] Illinois Inst Technol, Dept Civil & Architectural Engn, Chicago, IL 60616 USA
[3] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
关键词
Lean construction; cut and bent rebar; on-site fabrication; off-site fabrication; simulation model;
D O I
10.1080/01446190500529432
中图分类号
F [经济];
学科分类号
02 ;
摘要
Many contractors prefer on-site fabrication of rebar while others find that off-site fabrication is more advantageous. The economics of on-site and off-site fabrication of rebar need to be compared on the basis of several factors that include the project environment, wages, labour considerations, the initial investment for equipment, waste of rebar, the cost of inventory, cycle time, and supply chain management. This study presents an economic comparison of the on-site and off-site fabrication practices of rebar by means of a simulation model that makes use of the factors mentioned earlier. The model is populated with actual data obtained from a trade centre project in Istanbul, Turkey. The article indicates that the off-site fabrication practice would have been more costly than the on-site practice in the project in Istanbul, a finding that was to be expected in circumstances that prevail in most developing countries.
引用
收藏
页码:1185 / 1198
页数:14
相关论文
共 50 条
  • [21] A COMPARISON OF FAMILY FUNCTIONING IN USERS OF ON-SITE AND OFF-SITE DAY-CARE
    PICARD, MC
    LEE, CM
    DUXBURY, L
    [J]. CANADIAN PSYCHOLOGY-PSYCHOLOGIE CANADIENNE, 1994, 35 (2A): : 74 - 74
  • [22] Off-site and on-site vortex solitons in space-fractional photonic lattices
    Yao, Xiankun
    Liu, Xueming
    [J]. OPTICS LETTERS, 2018, 43 (23) : 5749 - 5752
  • [23] A comparison of on-site and off-site patent ductus arteriosus ligation in premature infants
    Gould, DS
    Montenegro, LM
    Gaynor, JW
    Lacy, SP
    Ittenbach, R
    Stephens, P
    Steven, JM
    Spray, TL
    Nicolson, SC
    [J]. PEDIATRICS, 2003, 112 (06) : 1298 - 1301
  • [24] SOUNDING THE ALARM - IN AN EMERGENCY, PEOPLE, BOTH ON-SITE AND OFF-SITE, NEED TO BE WARNED
    不详
    [J]. MANUFACTURING CHEMIST, 1986, 57 (09): : 75 - 75
  • [25] From off-site to on-site: A Flexible Framework for XR Prototyping in Sports Spectating
    Lo, Wei Hong
    Zollmann, Stefanie
    Regenbrecht, Holger
    [J]. PROCEEDINGS OF THE 2021 36TH INTERNATIONAL CONFERENCE ON IMAGE AND VISION COMPUTING NEW ZEALAND (IVCNZ), 2021,
  • [26] Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
    Arashpour, Mehrdad
    Wakefield, Ron
    Lee, E. W. M.
    Chan, Ricky
    Hosseini, M. Reza
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) : 1393 - 1402
  • [27] Integrating off-site and on-site panelized construction schedules using fleet dispatching
    Department of Civil and Environmental Engineering, University of Alberta, 7-203 Donadeo Innovation Centre for Engineering, Edmonton
    AB
    T6G 1H9, Canada
    不详
    04763, Korea, Republic of
    不详
    AB
    T6B 3S8, Canada
    [J]. Autom Constr, 2022,
  • [28] ECONOMICS OF REDUCING OFF-SITE COSTS OF WIND EROSION
    HUSZAR, PC
    [J]. LAND ECONOMICS, 1989, 65 (04) : 333 - 340
  • [29] Combining on-site and off-site analysis: towards a new paradigm for cultural heritage surveys
    Abergel, Violette
    Jacquot, Kevin
    De Luca, Livio
    Veron, Philippe
    [J]. DISEGNARECON, 2021, 14 (26)
  • [30] Comparison of on-site and off-site robot solutions to the traditional framing and drywall installation tasks
    Cynthia Brosque
    Jen Tobias Hawkins
    Tony Dong
    Joakim Örn
    Martin Fischer
    [J]. Construction Robotics, 2023, 7 (1) : 19 - 39