共 50 条
- [42] Automatic algorithm design for multi-objective hybrid flowshop scheduling problem with variable sublots [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (11): : 3403 - 3420
- [45] A GRASP heuristic for the multi-objective permutation flowshop scheduling problem [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (5-8): : 741 - 753
- [46] A GRASP heuristic for the multi-objective permutation flowshop scheduling problem [J]. The International Journal of Advanced Manufacturing Technology, 2011, 55 : 741 - 753
- [47] No-wait flow shop scheduling using fuzzy multi-objective linear programming [J]. JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2008, 345 (05): : 452 - 467