共 46 条
- [41] THE RESULTS OF IMPROVEMENT IN THE SLAB CASTERS IN NO-2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .2. AUTOMATION OF OPERATIONS IN CONTINUOUS-CASTING [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S154 - S154
- [43] MODIFICATION OF FINISHING TRAIN AT NO-2 HOT STRIP MILL, CHIBA WORKS, KAWASAKI-STEEL-CORP .1. WORK ROLL SHIFT MILL AND ITS ACTUAL OPERATION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1220 - 1220
- [44] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .2. DEVELOPMENT OF SLAB UNIFORM HEATING TECHNIQUES [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1197 - 1197
- [45] MODIFICATION OF FINISHING TRAIN AT NO-2 HOT STRIP MILL, CHIBA WORKS, KAWASAKI-STEEL-CORP .2. CONTROL-SYSTEM AND CONTROL EFFECT FOR WORK ROLL SHIFT MILL [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1221 - 1221
- [46] CONSTRUCTION OF FULLY CONTINUOUS COLD-ROLLING MILL FOR ULTRA-THIN GAUGE STEEL STRIP .1. ACCURACY OF SET-UP MODEL IN 6T-CM OF CHIBA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1158 - 1158