共 50 条
- [31] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S798 - S798
- [32] UPPER STACK PROFILE REPAIR AT MIZUSHIMA-2 BF, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S926 - S926
- [35] TOTAL BAR AND ROD ROLLING INFORMATION-SYSTEM AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP .2. THE APPLICATION OF A VOICE INPUT TERMINAL TO MIZUSHIMA BAR AND ROD MILL [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S306 - S306
- [36] HIGH BED HEIGHT OPERATION AT MIZUSHIMA NO-4 SINTERING PLANT, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S796 - S796
- [37] TECHNICAL DEVELOPMENT IN CONTINUOUS ANNEALING LINE AT MIZUSHIMA WORKS .2. METALLURGY ON PRODUCING OF COLD STRIP IN MIZUSHIMA CONTINUOUS ANNEALING LINE, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1471 - 1471
- [38] DESILICONIZATION AT RUNNER OF NO-4 BF AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORPORATION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S106 - S106
- [40] CHARACTERISTICS AND OPERATION OF NO 6 PICKLING LINE AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1191 - 1191