共 50 条
- [44] OPTIMAL 2-STAGE PRODUCTION SCHEDULING WITH SETUP TIMES SEPARATED AIIE TRANSACTIONS, 1979, 11 (03): : 261 - 263
- [46] Sequencing jobs with random processing times to minimize weighted completion time variance Annals of Operations Research, 1997, 70 : 241 - 260
- [48] Scheduling a two-stage no-wait hybrid flowshop with separated setup and removal times PROCEEDINGS OF THE 2004 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2004, : 1412 - 1416
- [49] SINGLE MACHINE BATCH SCHEDULING PROBLEM TO MINIMIZE MAKESPAN WITH CONTROLLABLE SETUP AND JOBS PROCESSING TIMES NUMERICAL ALGEBRA CONTROL AND OPTIMIZATION, 2015, 5 (01): : 71 - 77