共 50 条
- [2] ON JOHNSONS 2-MACHINE FLOWSHOP WITH RANDOM PROCESSING TIMES [J]. OPERATIONS RESEARCH, 1986, 34 (01) : 130 - 136
- [4] MINIMIZING THE MAKESPAN IN A 2-MACHINE FLOWSHOP WITH TIME LAGS AND SETUP CONDITIONS. [J]. ZOR. Zeitschrift fur Operations-Research, 1984, 28 (05): : 163 - 174
- [5] No-wait flowshop with separate setup times to minimize maximum lateness [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 35 (5-6): : 551 - 565
- [7] MINIMIZING MAXIMUM LATENESS IN A 2-MACHINE UNIT-TIME JOB SHOP [J]. COMPUTING, 1981, 27 (04) : 367 - 370
- [8] No-wait flowshop with separate setup times to minimize maximum lateness [J]. The International Journal of Advanced Manufacturing Technology, 2007, 35 : 551 - 565
- [9] Two-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times [J]. KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2006, 33 (02): : 233 - 252
- [10] Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2018, 37 (05): : 6774 - 6794