Significant factors causing delay in the UAE construction industry

被引:265
|
作者
Faridi, Arshi Shakeel [1 ]
El-Sayegh, Sameh Monir [2 ]
机构
[1] Amer Univ Sharjah, Dept Engn Syst & Management, Sharjah, U Arab Emirates
[2] Amer Univ Sharjah, Dept Civil Engn, Sharjah 26666, U Arab Emirates
关键词
Delay; project management; project controls; time; UAE;
D O I
10.1080/01446190600827033
中图分类号
F [经济];
学科分类号
02 ;
摘要
Construction delay is considered one of the most recurring problems in the construction industry. Delays have an adverse impact on project success in terms of time, cost, quality and safety. The effects of construction delays are not confined to the construction industry only, but influence the overall economy of a country like UAE, where construction plays a major role in its development and contributes 14% to the GDP. Thus, it is essential to define the most significant causes of delay in order to avoid or minimise their impact on construction projects. A detailed questionnaire was developed and used to get input from professionals associated with the UAE construction industry. The perspective of contractors and consultants has been analysed to rank the causes of delays based on their Relative Importance Index. Contractors and consultants were in agreement on the most significant causes of delays. The research revealed that 50% of the construction projects in UAE encounter delays and are not completed on time. The top 10 most significant causes of construction delays have been identified by this research. Approval of drawings, inadequate early planning and slowness of the owners' decision-making process are the top causes of delay in the UAE construction industry.
引用
收藏
页码:1167 / 1176
页数:10
相关论文
共 50 条
  • [21] SIGNIFICANT FACTORS CAUSING TIME AND COST OVERRUNS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP: CONTRACTORS' PERSPECTIVE
    Enshassi, Adnan
    Kumaraswamy, Mohan
    Al-Najjar, Jomah
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (01) : 35 - 60
  • [22] Exploring the Adoption of BIM in the UAE construction industry for AEC firms
    Mehran, Donya
    [J]. ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 1110 - 1118
  • [23] Time and cost overruns in the UAE construction industry: a critical analysis
    Johnson, Reshma Mary
    Babu, Robin Itty Ipe
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (05) : 402 - 411
  • [24] An empirical study of the impact of lean on the performance of the construction industry in UAE
    Shurrab, Jaber
    Hussain, Matloub
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2018, 16 (05) : 694 - 710
  • [25] FACTORS CAUSING DELAY IN THE DIAGNOSIS OF LYMPHOBLASTOMA
    SCHOOLMAN, JG
    SIEGAL, HA
    [J]. ANNALS OF OTOLOGY RHINOLOGY AND LARYNGOLOGY, 1949, 58 (01): : 243 - 248
  • [26] Inhibiting Factors of Cost Performance in UAE Construction Projects
    Alhammadi, Ahmed Salem Ahmed Marey
    Memon, Aftab Hameed
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 126 - 132
  • [27] Delay mitigation in the Malaysian construction industry
    Abdul-Rahman, H
    Berawi, MA
    Berawi, AR
    Mohamed, O
    Othman, M
    Yahya, IA
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) : 125 - 133
  • [28] CAUSES OF DELAY IN INDIAN CONSTRUCTION INDUSTRY
    Venkatesh, M. P.
    Renuka, S. M.
    Umarani, C.
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2768 - 2773
  • [29] Causes of Delay in Construction Industry in Iran
    Kouchaknezhad, Mehran
    Ali, Abang Abdullah Abang
    Kadir, Mohammad Razali Abdul
    [J]. INTERNATIONAL CONSTRUCTION BUSINESS & MANAGEMENT SYMPOSIUM 2011: WINNING & SUSTAINABLE STRATEGIES FOR INTERNATIONAL PROJECTS, 2011, : 211 - 217
  • [30] Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices
    Al-Hajj, Assem
    Hamani, Karima
    [J]. ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2011, 7 (04) : 221 - 235