Automated Planning and Scheduling System for the Composite Component Manufacturing Workshop

被引:0
|
作者
Zhongyi, Mei [1 ]
Younus, Muhammad [1 ]
Yongjin, Liu [1 ]
机构
[1] Beijing Univ Aeronaut & Astronaut, Sch Mech Engn & Automat, 37 Xueyuan Rd, Beijing 100191, Peoples R China
关键词
composite component; genetic algorithm; MES; production planning and scheduling;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Aerospace manufacturing system is very intricate due to the extreme material and information flow. Management of these variables need automated planning and execution system. Commercially available software systems are highly expensive and are not designed for specific need. This paper describes a Manufacturing Execution System (MES) for the composite component manufacturing workshop of an aerospace enterprise. The production planning and scheduling is the core module of the MES that described in detail. The system shows the production planning and production scheduling have diverse effect on the workshop production. The significance of the automatic scheduling is emphasized. The characteristic of the composite component manufacturing and production scheduling is analyzed in detail. An improved genetic algorithm for automatic production scheduling is emphatically described. By improving some methods to the traditional genetic algorithm, the convergence rate of the improved genetic algorithm is increased. Three-layer structure is adopted to design and develop the system. Some practical manufacturing composite components are selected to verify the validity of the improved genetic algorithm and the developed system. The developed system has been applied in the composite component manufacturing workshop. The results show that working efficiency of the production planning and scheduling has been improved.
引用
收藏
页码:75 / 83
页数:9
相关论文
共 50 条
  • [41] Process planning and scheduling for distributed manufacturing
    Sabuncuoglu, Ihsan
    Karpat, Yigit
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (04) : 1151 - 1152
  • [42] PLANNING AND SCHEDULING IN JAPANESE SEMICONDUCTOR MANUFACTURING
    DUENYAS, I
    FOWLER, JW
    SCHRUBEN, LW
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 1994, 13 (05) : 323 - 332
  • [43] MAS-based production scheduling system for manufacturing cell-based workshop
    Chu Hong-yan
    Cao Quan-jun
    Fei Ren-yuan
    [J]. FRONTIERS OF MECHANICAL ENGINEERING, 2006, 1 (04) : 375 - 380
  • [44] Automated Planning and Scheduling with Swarm Intelligence
    Cheng, Shi
    Lu, Hui
    Lei, Xiujuan
    [J]. ADVANCES IN SWARM INTELLIGENCE, PT II, ICSI 2024, 2024, 14789 : 26 - 35
  • [45] Deadlock-free scheduling of an automated manufacturing system based on Petri Nets
    Xiong, HH
    Zhou, MC
    [J]. 1997 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION - PROCEEDINGS, VOLS 1-4, 1997, : 945 - 950
  • [46] Multilevel intelligent scheduling and control system for an automated flow shop manufacturing environment
    Monfared, MAS
    Yang, JB
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (01) : 147 - 168
  • [47] Dispatching, routing, and scheduling of two automated guided vehicles in a flexible manufacturing system
    Langevin, A
    Lauzon, D
    Riopel, D
    [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1996, 8 (03): : 247 - 262
  • [48] Energy-efficient path planning for a single-load automated guided vehicle in a manufacturing workshop
    Zhang, Zhongwei
    Wu, Lihui
    Zhang, Wenqiang
    Peng, Tao
    Zheng, Jun
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [49] Multi-Objective Scheduling of Jobs, Automated Guided Vehicles and Automated Storage/Retrieval System in Flexible Manufacturing System
    Jerald, J.
    GnanavelBabu, A.
    Haq, A. Noorul
    [J]. JOURNAL FOR MANUFACTURING SCIENCE AND PRODUCTION, 2008, 9 (1-2) : 61 - 80
  • [50] Predictable Interrupt Management and Scheduling in the Composite Component-based System
    Parmer, Gabriel
    West, Richard
    [J]. RTSS: 2008 REAL-TIME SYSTEMS SYMPOSIUM, PROCEEDINGS, 2008, : 232 - 243