Automated Planning and Scheduling System for the Composite Component Manufacturing Workshop

被引:0
|
作者
Zhongyi, Mei [1 ]
Younus, Muhammad [1 ]
Yongjin, Liu [1 ]
机构
[1] Beijing Univ Aeronaut & Astronaut, Sch Mech Engn & Automat, 37 Xueyuan Rd, Beijing 100191, Peoples R China
关键词
composite component; genetic algorithm; MES; production planning and scheduling;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Aerospace manufacturing system is very intricate due to the extreme material and information flow. Management of these variables need automated planning and execution system. Commercially available software systems are highly expensive and are not designed for specific need. This paper describes a Manufacturing Execution System (MES) for the composite component manufacturing workshop of an aerospace enterprise. The production planning and scheduling is the core module of the MES that described in detail. The system shows the production planning and production scheduling have diverse effect on the workshop production. The significance of the automatic scheduling is emphasized. The characteristic of the composite component manufacturing and production scheduling is analyzed in detail. An improved genetic algorithm for automatic production scheduling is emphatically described. By improving some methods to the traditional genetic algorithm, the convergence rate of the improved genetic algorithm is increased. Three-layer structure is adopted to design and develop the system. Some practical manufacturing composite components are selected to verify the validity of the improved genetic algorithm and the developed system. The developed system has been applied in the composite component manufacturing workshop. The results show that working efficiency of the production planning and scheduling has been improved.
引用
收藏
页码:75 / 83
页数:9
相关论文
共 50 条
  • [21] REDS - A DYNAMIC PLANNING, SCHEDULING, AND CONTROL-SYSTEM FOR MANUFACTURING
    HADAVI, K
    SHAHRARAY, MS
    VOIGT, K
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 1990, 9 (04) : 332 - 344
  • [22] A hierarchic approach to production planning and scheduling of a flexible manufacturing system
    Persi, P
    Ukovich, W
    Pesenti, R
    Nicolich, M
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1999, 15 (05) : 373 - 385
  • [23] Planning and Scheduling in Additive Manufacturing
    Dvorak, Filip
    Micali, Maxwell
    Mathieu, Mathias
    [J]. INTELIGENCIA ARTIFICIAL-IBEROAMERICAL JOURNAL OF ARTIFICIAL INTELLIGENCE, 2018, 21 (62): : 40 - 52
  • [24] Manufacturing planning and scheduling in small manufacturing company
    Legg, L
    Etezadi, A
    [J]. ADVANCES IN MANUFACTURING TECHNOLOGY - XIII, 1999, : 125 - 129
  • [25] Production planning for hybrid remanufacturing and manufacturing system with component recovery
    Han, S. H.
    Dong, M. Y.
    Lu, S. X.
    Leung, S. C. H.
    Lim, M. K.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (10) : 1447 - 1460
  • [26] CONCEPT - IN INTERACTIVE, MODULAR COMPONENT DESIGN AND MANUFACTURING PLANNING SYSTEM
    JORGENSEN, J
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1982, 6 (03) : 203 - 203
  • [27] A HIERARCHICAL SYSTEM FOR DYNAMICALLY SOLVING PLANNING AND SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING SYSTEM
    LIU, PS
    FU, LC
    [J]. 1989 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-3: CONFERENCE PROCEEDINGS, 1989, : 77 - 82
  • [28] Scheduling and control of automated manufacturing systems
    H.-O. Günther
    T. E. Lee
    [J]. OR Spectrum, 2007, 29 : 373 - 374
  • [29] Scheduling and control of automated manufacturing systems
    Guenther, H.-O.
    Lee, T. E.
    [J]. OR SPECTRUM, 2007, 29 (03) : 373 - 374
  • [30] Daily planning and scheduling system for the EDS process in a semiconductor manufacturing facility
    Lee, Young Hoon
    Ham, Myoungsoo
    Yoo, Bruce
    Lee, Jae Sun
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (5-6): : 568 - 579