Automated Planning and Scheduling System for the Composite Component Manufacturing Workshop

被引:0
|
作者
Zhongyi, Mei [1 ]
Younus, Muhammad [1 ]
Yongjin, Liu [1 ]
机构
[1] Beijing Univ Aeronaut & Astronaut, Sch Mech Engn & Automat, 37 Xueyuan Rd, Beijing 100191, Peoples R China
关键词
composite component; genetic algorithm; MES; production planning and scheduling;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Aerospace manufacturing system is very intricate due to the extreme material and information flow. Management of these variables need automated planning and execution system. Commercially available software systems are highly expensive and are not designed for specific need. This paper describes a Manufacturing Execution System (MES) for the composite component manufacturing workshop of an aerospace enterprise. The production planning and scheduling is the core module of the MES that described in detail. The system shows the production planning and production scheduling have diverse effect on the workshop production. The significance of the automatic scheduling is emphasized. The characteristic of the composite component manufacturing and production scheduling is analyzed in detail. An improved genetic algorithm for automatic production scheduling is emphatically described. By improving some methods to the traditional genetic algorithm, the convergence rate of the improved genetic algorithm is increased. Three-layer structure is adopted to design and develop the system. Some practical manufacturing composite components are selected to verify the validity of the improved genetic algorithm and the developed system. The developed system has been applied in the composite component manufacturing workshop. The results show that working efficiency of the production planning and scheduling has been improved.
引用
收藏
页码:75 / 83
页数:9
相关论文
共 50 条
  • [1] Production Planning and Scheduling for the Composite Component Manufacturing Workshop
    Mei Zhongyi
    Younus, Muhammad
    Liu Yongjin
    [J]. WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS 1 AND 2, 2010, : 1053 - 1058
  • [2] Manufacturing System Planning and Scheduling
    Merkuryeva, G.
    Shires, N.
    [J]. SIMULATION-BASED CASE STUDIES IN LOGISTICS: EDUCATION AND APPLIED RESEARCH, 2009, : 19 - +
  • [3] Production Process Management for the Composite Component Manufacturing Workshop
    Mei, Zhongyi
    Liu, Yongjin
    Younus, Muhammad
    [J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4, 2011, 44-47 : 101 - 105
  • [4] ROBUST PLANNING AND SCHEDULING FOR AUTOMATED BATCH MANUFACTURING SYSTEMS
    VELAGAPUDI, NK
    GHOSH, BK
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1989, 17 : 119 - 123
  • [5] A planning and scheduling system for manufacturing environment
    Pereira, MG
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (1-2) : 189 - 192
  • [6] Research on Workshop Scheduling of SMT Product Manufacturing System
    Wu, Zhaohua
    [J]. MANUFACTURING PROCESS TECHNOLOGY, PTS 1-5, 2011, 189-193 : 2577 - 2580
  • [7] PLANNING AND SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM USING A DYNAMIC ROUTING METHOD FOR AUTOMATED GUIDED VEHICLES
    LIU, PS
    FU, LC
    [J]. PROCEEDINGS - 1989 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOL 1-3, 1989, : 1584 - 1589
  • [8] A hierarchical system for automated path planning and scheduling
    Korzeniowski, KA
    McVey, CB
    [J]. MOBILE ROBOTS XIII AND INTELLIGENT TRANSPORTATION SYSTEMS, 1998, 3525 : 204 - 211
  • [9] A Component Based Reconfigurable Scheduling System for Semiconductor Manufacturing
    Wu, Ying
    Qiao, Fei
    Li, Li
    Ye, Kai
    [J]. MANUFACTURING ENGINEERING AND AUTOMATION I, PTS 1-3, 2011, 139-141 : 1644 - 1647
  • [10] Improved Domain Modeling for Realistic Automated Planning and Scheduling in Discrete Manufacturing
    Rogalla, Antje
    Fay, Alexander
    Niggemann, Oliver
    [J]. 2018 IEEE 23RD INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION (ETFA), 2018, : 464 - 471