Development of benchmark stoping widths for longhole narrow-vein stoping

被引:2
|
作者
Stewart, P. [1 ]
Trueman, R. [2 ]
Lyman, G. [2 ]
机构
[1] Golder Associates, Brisbane, Qld, Australia
[2] Univ Queensland, Julius Kruttschnitt Minerals Res Ctr, Brisbane, Qld, Australia
关键词
Narrow vein; Dilution; Stoping; Overbreak; Benchmarking;
D O I
10.1179/174328608X318270
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
In narrow vein mining it is often not possible to limit stope width to the vein width when utilising blasting for rock breakage. A probabilistic benchmarking method is used to estimate benchmark stability stoping widths and benchmark average stoping width for three commonly used narrow vein longhole blast patterns. Average stoping widths for inline, staggered and dice-5 blast patterns have been estimated at 1.3, 1.5 and 1.7 m respectively. Average stoping width can be used to assess planned and unplanned dilution. Additionally, a concept termed the benchmark stability stoping width has been defined and quantified for the three blasting patterns. Stability stoping widths for inline, staggered and dice-5 have been estimated at 1.6, 2.0 and 2.1 m respectively. Narrow vein stopes within these limits after blasting can be regarded as stable.
引用
收藏
页码:167 / 175
页数:9
相关论文
共 50 条
  • [31] Application of Thermal Fragmentation in Australian Hard Rock Underground Narrow-Vein Mining
    Drake, Bradley
    Koroznikova, Larissa
    Tuck, Michael
    Durkin, Steve
    MINING METALLURGY & EXPLORATION, 2020, 37 (01) : 219 - 229
  • [32] Application of Thermal Fragmentation in Australian Hard Rock Underground Narrow-Vein Mining
    Bradley Drake
    Larissa Koroznikova
    Michael Tuck
    Steve Durkin
    Mining, Metallurgy & Exploration, 2020, 37 : 219 - 229
  • [33] Sublevel Stoping of Narrow-reef, Steep Lead-zinc Mineralizations with Difficult Deposit Conditions.
    Schmidt, Dieter
    Erzmetall: Journal for Exploration, Mining and Metallurgy, 1983, 36 (7-8): : 352 - 359
  • [34] Cemented Paste Backfill Geomechanics at a Narrow-Vein Underhand Cut-and-Fill Mine
    Raffaldi, Michael Jon
    Seymour, Joseph Bradford
    Richardson, Jerald
    Zahl, Eric
    Board, Mark
    ROCK MECHANICS AND ROCK ENGINEERING, 2019, 52 (12) : 4925 - 4940
  • [35] Mapping and sampling for real-time development of mine plans in high-grade, narrow-vein, underground mining
    Palmer, Luke
    Moore, Kathryn
    Thomas, Gareth
    Broom, Steve
    Roethe, Richard
    Roberts, Dominic
    LIFE WITH ORE DEPOSITS ON EARTH, PROCEEDINGS OF THE 15TH SGA BIENNIAL MEETING, 2019, VOLS 1-4, 2019, : 1501 - 1504
  • [36] Cemented Paste Backfill Geomechanics at a Narrow-Vein Underhand Cut-and-Fill Mine
    Michael Jon Raffaldi
    Joseph Bradford Seymour
    Jerald Richardson
    Eric Zahl
    Mark Board
    Rock Mechanics and Rock Engineering, 2019, 52 : 4925 - 4940
  • [37] Classification of Stoping Pillars for Long-Term Control of the Development of Mining Work in Coal Mines.
    Vorob'ev, B.M.
    Komkov, V.V.
    Izvestiya Vysshikh Uchebnykh Zavedenii, Gornyi Zhurnal, 1974, (02): : 3 - 8
  • [38] REDUCING WASTE-ROCK DILUTION IN NARROW-VEIN CONDITIONS AT TUNGSTEN MINES IN CHINA.
    Li Yihong
    Zhang Weijin
    Mining science & technology, 1986, 4 (01): : 1 - 7
  • [39] Factors Influencing Stope Hanging Wall Stability and Ore Dilution in Narrow-Vein Deposits: Part 1
    Abdellah, Wael R. Elrawy
    Hefni, Mohammed A.
    Ahmed, Haitham M.
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (02) : 1451 - 1470
  • [40] Factors Influencing Stope Hanging Wall Stability and Ore Dilution in Narrow-Vein Deposits: Part II
    Hefni, Mohammed A.
    Abdellah, Wael R. Elrawy
    Ahmed, Haitham M.
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (04) : 3795 - 3813