STABILITY OF AN OPTIMAL SCHEDULE

被引:0
|
作者
SOTSKOV, YN
机构
关键词
OPTIMIZATION; SCHEDULE; STABILITY; DISJUNCTIVE GRAPH;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with the problem of optimal scheduling n uninterrupted operations on m machines with respect to a regular criterion. The stability radius rho(s)(ABAR) for an optimal schedule SBAR relative to the changes in the vector ABAR = (a1,..., a(n)) of durations of operations Q = {1,..., n} is studied. The problem of calculating rho(s)(ABAR) is reduced to the solution of a non-linear mathematical programming problem. The necessary and sufficient conditions for rho(s)(ABAR) > 0 and for rho(s)(ABAR) = infinity are given in the case when SBAR is the optimal makespan schedule.
引用
收藏
页码:91 / 102
页数:12
相关论文
共 50 条
  • [41] AN OPTIMAL VEHICLE-FLEET INSPECTION SCHEDULE
    JARDINE, AKS
    HASSOUNAH, MI
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1990, 41 (09) : 791 - 799
  • [42] APPLICATION OF OPTIMAL THEORY TO DRUG ADMINISTRATION SCHEDULE
    KUSUOKA, H
    INOUE, M
    INADA, H
    HORI, M
    MATSUO, H
    ABE, H
    KAJIYA, F
    [J]. PHYSICS IN MEDICINE AND BIOLOGY, 1980, 25 (05): : 968 - 968
  • [43] DETAILING AN OPTIMAL WORK SCHEDULE FOR AN INDUSTRIAL COMPLEX
    DUDNIKOV, EE
    [J]. AUTOMATION AND REMOTE CONTROL, 1973, 34 (05) : 796 - 803
  • [44] Simulated annealing: Searching for an optimal temperature schedule
    Cohn, H
    Fielding, M
    [J]. SIAM JOURNAL ON OPTIMIZATION, 1999, 9 (03) : 779 - 802
  • [45] Optimal power schedule for distributed MIMO links
    Rong, Yue
    Hua, Yingbo
    [J]. IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, 2008, 7 (08) : 2896 - 2900
  • [46] OPTIMAL-GROWTH SCHEDULE OF A PERENNIAL PLANT
    IWASA, Y
    COHEN, D
    [J]. AMERICAN NATURALIST, 1989, 133 (04): : 480 - 505
  • [47] The optimal immunotherapy cluster schedule in clinical practice
    Fernández-Távora, L
    Moreno, C
    Martín, S
    Rico, P
    [J]. JOURNAL OF INVESTIGATIONAL ALLERGOLOGY AND CLINICAL IMMUNOLOGY, 2003, 13 (03) : 193 - 201
  • [48] The optimal schedule for pulsar timing array observations
    Lee, K. J.
    Bassa, C. G.
    Janssen, G. H.
    Karuppusamy, R.
    Kramer, M.
    Smits, R.
    Stappers, B. W.
    [J]. MONTHLY NOTICES OF THE ROYAL ASTRONOMICAL SOCIETY, 2012, 423 (03) : 2642 - 2655
  • [49] Optimal schedule for periodic imperfect preventive maintenance
    Shin, SW
    Kim, DK
    Lim, JH
    [J]. Advanced Reliability Modeling, 2004, : 467 - 473
  • [50] Optimal segmentation of projects - Schedule and cost considerations
    Shtub, A
    Raz, T
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (02) : 278 - 283