A Brief Assessment of a Dam and Its Failure Prevention

被引:8
|
作者
Lukman, S. [1 ]
Otun, J. A. [1 ]
Adie, D. B. [1 ]
Ismail, A. [1 ]
Oke, I. A. [2 ]
机构
[1] Ahmadu Bello Univ, Water Resources & Environm Engn, Zaria, Nigeria
[2] Obafemi Awolowo Univ, Dept Civil Engn, Ife, Nigeria
关键词
Dams; Lives; Properties; Seepage; Silting; Leakage; Embankment;
D O I
10.1007/s11668-010-9420-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Dams are artificial lakes created to reserve water for a particular purpose. Reports on failure of dams are common things nowadays. Effects of dam's failure on man and environment are well known, which require preventive measures. This article presents a brief assessment of a dam in Nigeria and suggested necessary failure preventive measures. The dam site was visited (up and down streams), selected soil and geological properties of the dam were conducted with a particular attention to the release of water from the reservoir as seepage, or filling of the reservoir by silt from erosion. Hydrology and hydraulic data of the study area and spillway were obtained and analyzed. The study revealed that the soil is mainly sandy-loamy soil of averagely sand (73.99 +/- 3.12), clay (8.53 +/- 0.18), and silt (17.48 +/- 1.88). Geological structure of the soil revealed that the study area is in basement complex. The reservoir capacity is 177,000,000 m(3) with about 18.5-m hydraulic high, silting rate of 0.301% per year. Hydraulic conductivity, transmissivity, and specific discharge were found to be of high side of 9.31 x 10(-4) m/s, 5.08 x 10(-4) m(2)/s, and 98.25 m/year, respectively. It was concluded that the current problems of the dam are high silting rate and seepage, big trees on the embankment and beside the spillway. All these may lead to failure of the dam in the following ways: lack of water in the reservoir due to seepage and silting, eutrophication and non-potable of the water due to silting and collapse of the embankment due to the presence of big trees. It was suggested that necessary and urgent solutions such as removal of trees from embankment, desilting and seepage control must be provided for safety of lives and properties.
引用
收藏
页码:97 / 109
页数:13
相关论文
共 50 条
  • [41] PREVENTION OF RUBBER DAM HYPERSENSITIVITY
    BEAUDRY, RJ
    [J]. JOURNAL OF ENDODONTICS, 1984, 10 (11) : 544 - 545
  • [42] Derivation of Dam Failure Empirical Equations for Landslide Dam
    Niu, Zhipan
    Zhu, Hongbing
    Luo, Jing
    Deng, Yongting
    [J]. PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS I AND II, 2013, : 5680 - 5687
  • [43] Safety culture assessment and its relationship with the accidents in a dam construction project
    Maleki, A.
    Darvishi, E.
    Moradi, S.
    [J]. JOURNAL OF HEALTH AND SAFETY AT WORK, 2015, 4 (04) : 59 - +
  • [44] Assessment model of dam behavior with fuzzy extension theory and its application
    Su, Huai-Zhi
    Gu, Chong-Shi
    Wu, Zhong-Ru
    [J]. Yantu Lixue/Rock and Soil Mechanics, 2006, 27 (12): : 2115 - 2121
  • [45] Deformation Risk Assessment of the Lar Dam: Monitoring Its Stability Condition
    Ghadimi, Mehrnoosh
    Kiani, Mohammadali
    [J]. SUSTAINABILITY, 2024, 16 (11)
  • [46] Assessment model of dam behavior with fuzzy extension theory and its application
    Su Huai-zhi
    Gu Chong-shi
    Wu Zhong-ru
    [J]. ROCK AND SOIL MECHANICS, 2006, 27 (12) : 2115 - 2121
  • [47] Ventricular remodeling and its prevention in the treatment of heart failure
    Patten, RD
    Udelson, JE
    Konstam, MA
    [J]. CURRENT OPINION IN CARDIOLOGY, 1998, 13 (03) : 162 - 167
  • [48] Overtopping Failure of a Reinforced Tailings Dam: Laboratory Investigation and Forecasting Model of Dam Failure
    Jing, Xiaofei
    Chen, Yulong
    Williams, David J.
    Serna, Marcelo L.
    Zheng, Hengwei
    [J]. WATER, 2019, 11 (02):
  • [49] BRIEF ON ACCIDENT PREVENTION
    SCHWENGER, CW
    [J]. CANADIAN JOURNAL OF PUBLIC HEALTH, 1967, 58 (09): : 417 - 424
  • [50] Brief overview of the Baia Mare dam breach
    DeVries, FW
    [J]. CYANIDE: SOCIAL, INDUSTRIAL AND ECONOMIC ASPECTS, 2001, : 11 - 14