Deformation Risk Assessment of the Lar Dam: Monitoring Its Stability Condition

被引:0
|
作者
Ghadimi, Mehrnoosh [1 ,2 ]
Kiani, Mohammadali [1 ]
机构
[1] Univ Tehran, Fac Geog, Tehran 1417853933, Iran
[2] Univ Helsinki, Inst Seismol, Dept Geosci & Geog, FI-00014 Helsinki, Finland
关键词
dam failure; InSAR; TerraSAR-X; Sentinel-1A; dam stability; terrestrial surveying network; SAR; INTERFEROMETRY;
D O I
10.3390/su16114335
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Dam stability is one of the most essential geotechnical engineering challenges. Studying the structural behavior of dams during their useful life is an essential component of their safety. Terrestrial surveying network approaches are typically expensive and time-consuming. Over the last decade, the interferometric synthetic aperture radar (InSAR) method has been widely used to monitor millimeter displacements in dam crests. This research investigates the structural monitoring of the Lar Dam in Iran, using InSAR and the terrestrial surveying network technique to identify the possible failure risk of the dam. Sentinel-1A images taken from 5 February 2015 to 30 September 2019 and TerraSAR-X (09.05.2018 to 16.08.2018) images were analyzed to investigate the dam's behavior. The InSAR results were compared with those of the terrestrial surveying network for the period of 1992 to 2019. The Sentinel-1 results implied that the dam on the left side moved over 8 mm/yr. However, the pillars to the left abutment indicated an uplift, which is consistent with the TerraSAR-X results. Also, the TerraSAR-X data indicated an 8 mm displacement over a three-month period. The terrestrial surveying showed that the largest uplift was 19.68 mm at the TB4 point on the left side and upstream of the body, while this amount was 10 mm in the interferometry analysis for the period of 2015-2020. The subsidence rate increased from the middle part toward the left abutment. The geological observations made during the ninth stage of the terrestrial surveying network indicate that there was horizontal and vertical movement over time, from 1992 to 2019. However, the results of the InSAR processing in the crown were similar to those of the terrestrial surveying network. Although different comparisons were used for the measurements, the difference in the displacement rates was reasonable, but all three methods showed the same trend in terms of uplift and displacement.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Deformation Monitoring of Geomechanical Model Test and Its Application in Overall Stability Analysis of a High Arch Dam
    Yang, Baoquan
    Zhang, Lin
    Liu, Enlong
    Dong, Jianhua
    Zhu, Honghu
    Chen, Yuan
    [J]. JOURNAL OF SENSORS, 2015, 2015
  • [2] Assessment model of dam operation risk based on monitoring data
    ZhongRu Wu
    HuaiZhi Su
    HaiQing Guo
    [J]. Science in China Series E: Technological Sciences, 2007, 50 : 144 - 152
  • [3] Assessment model of dam operation risk based on monitoring data
    WU ZhongRu SU HuaiZhi GUO HaiQing College of Water Conservancy and Hydropower Engineering Hohai University Nanjing China National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety Nanjing China
    [J]. Science in China(Series E:Technological Sciences), 2007, (Series E:Technological Sciences) : 144 - 152
  • [4] Assessment model of dam operation risk based on monitoring data
    WU ZhongRu1
    2 National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety
    [J]. Science China Technological Sciences, 2007, (S1) : 144 - 152
  • [5] Assessment model of dam operation risk based on monitoring data
    Wu ZhongRu
    Su HuaiZhi
    Guo HaQing
    [J]. SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2007, 50 (Suppl 1): : 144 - 152
  • [6] GPS in the tailings dam deformation monitoring
    Li, Wei
    Wang, Chang
    [J]. ISMSSE 2011, 2011, 26
  • [7] Deformation stability analysis of Xiluodu arch dam under stress-seepage coupling condition
    [J]. Lin, P. (celinpe@tsinghua.edu.cn), 1600, Academia Sinica (32):
  • [8] Development of a risk assessment based condition monitoring system
    Thomas, M
    Redstall, M
    Stelling, R
    Halls, M
    [J]. COMADEM '99, PROCEEDINGS, 1999, : 51 - 57
  • [9] Risk assessment of earth dam overtopping and its application research
    Sherong Zhang
    Yaosheng Tan
    [J]. Natural Hazards, 2014, 74 : 717 - 736
  • [10] Risk assessment of earth dam overtopping and its application research
    Zhang, Sherong
    Tan, Yaosheng
    [J]. NATURAL HAZARDS, 2014, 74 (02) : 717 - 736