TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - CLOSURE

被引:0
|
作者
REDA, R
CARR, RI
机构
关键词
D O I
10.1061/(ASCE)0733-9364(1991)117:2(375.2)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:375 / 376
页数:2
相关论文
共 50 条
  • [41] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189
  • [42] Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem
    Anagnostopoulos, K. P.
    Kotsikas, L.
    APPLIED MATHEMATICS AND COMPUTATION, 2010, 217 (01) : 260 - 270
  • [43] Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization
    Afshar, A.
    Ziaraty, A. Kasaeian
    Kaveh, A.
    Sharifi, F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (07) : 668 - 674
  • [44] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction
    Xie, Haiyan
    Sumam, Rugma Jayachandrakumar
    Carey, Nicholas
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
  • [45] Network analysis algorithm for the solution of discrete time-cost trade-off problem
    Önder Halis Bettemir
    M. Talat Birgönül
    KSCE Journal of Civil Engineering, 2017, 21 : 1047 - 1058
  • [46] The LP/IP hybrid method for construction time-cost trade-off analysis
    Department of General Engineering, Univ. Illinois at Urbana-Champaign, 104 S. Mathews Ave, Urbana, IL 61801, United States
    不详
    Constr. Manage. Econ., 3 (265-276):
  • [47] Using machine learning and GA to solve time-cost trade-off problems
    Li, H
    Cao, JN
    Love, PED
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (05) : 347 - 353
  • [49] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39