EQUIPMENT SELECTION-PROBLEMS IN JUST-IN-TIME MANUFACTURING SYSTEMS

被引:3
|
作者
GUNASEKARAN, A [1 ]
GOYAL, SK [1 ]
MARTIKAINEN, T [1 ]
YLIOLLI, P [1 ]
机构
[1] CONCORDIA UNIV,DEPT DECIS SCI & MIS,MONTREAL H3G 1M8,QUEBEC,CANADA
关键词
JIT; EQUIPMENT SELECTION; MATHEMATICAL MODELING; CAPACITY PLANNING;
D O I
10.1057/jors.1993.64
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper is concerned with the development of a mathematical model for solving the problem of equipment selection in just-in-time (JIT) manufacturing systems. Equipment selection issues are important, particularly during the initial stages of implementing JIT. In this paper a mathematical model is proposed for capacity planning and for selecting equipment in a multi-stage JIT production system. An example situation is considered to explain the application and behaviour of the model.
引用
收藏
页码:345 / 353
页数:9
相关论文
共 50 条