共 50 条
- [11] Tailored just-in-time and MRP systems in carpet manufacturing Production and Inventory Management Journal, 39 (01): : 46 - 50
- [13] SCHEDULING FOR JUST-IN-TIME MANUFACTURING ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 16 (02): : 117 - 124
- [14] Just-in-time manufacturing in Ghana Industrial Management and Data Systems, 2001, 101 (3-4): : 106 - 113
- [16] Equipment sizing for just-in-time material distribution in manufacturing plants - A simulation approach ICMH' 2005: Proceedings of the 5th International Conference on Material Handling, 2005, : 141 - 146
- [20] Implementation of Just-In-Time production systems in manufacturing firms in Ghana DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1085 - 1087