摘要
Setting kanban sizes is one of the first decisions that users of kanban system must address. yet researchers have largely assumed kanban sizes to be given. This paper investigates the effect of varying kanban size on the performance of just-in-time (JIT) manufacturing systems. Two types of JIT production systems, the Pull-type and the Hybrid-type are analysed using computer simulation models. The performance measures considered simultaneously are the fill rate, in-process inventory, and manufacturing lead time. Parameters such as demand rate, processing time, and kanban size are taken into consideration, thereby finding the possible solutions of the kanban size that can be employed to achieve the most favourable conditions for production. A favourable condition usually refers to the ability of the system to produce finished goods at a shortest possible lead time, which the customers are always demanding for. Both the single product and multi-products manufacturing environments are investigated. With reference to the analysis, for a single product, as the kanban size increased, the fill rate decreased. whilst with both the in-process inventory and the manufacturing lead time increased. Generally, for multi-products manufacture, it was observed that as the kanban size increased, the fill rate increased with a decrease in the manufacturing lead time. However, for multi-products the interaction between the manufacturing lead time and the fill rate is discussed in depth in this paper. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:146 / 160
页数:15
相关论文
共 50 条
  • [1] JUST-IN-TIME (JIT), WITH KANBAN, MANUFACTURING SYSTEM SIMULATION ON A MICROCOMPUTER
    SCHROER, BJ
    BLACK, JT
    SHOU, XZ
    [J]. SIMULATION, 1985, 45 (02) : 62 - 70
  • [2] THE KANBAN ASSIGNMENT PROBLEM IN SERIAL JUST-IN-TIME PRODUCTION SYSTEMS
    CO, HC
    JACOBSON, SH
    [J]. IIE TRANSACTIONS, 1994, 26 (02) : 76 - 85
  • [3] Modelling and analysis of just-in-time manufacturing systems
    Goyal, SK
    Gunasekaran, A
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1995, 15 (09) : 8 - 8
  • [4] Logistics and inventory systems of just-in-time manufacturing
    Takakuwa, S.
    [J]. ANNALS OF DAAAM FOR 2006 & PROCEEDINGS OF THE 17TH INTERNATIONAL DAAAM SYMPOSIUM: INTELLIGENT MANUFACTURING & AUTOMATION: FOCUS ON MECHATRONICS AND ROBOTICS, 2006, : 411 - 412
  • [5] MODELING AND ANALYSIS OF JUST-IN-TIME MANUFACTURING SYSTEMS
    GUNASEKARAN, A
    GOYAL, SK
    MARTIKAINEN, T
    YLIOLLI, P
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (01) : 23 - 37
  • [6] Hospital efficiency management: the just-in-time and Kanban technique
    Persona, A.
    Battini, D.
    Rafele, C.
    [J]. INTERNATIONAL JOURNAL OF HEALTHCARE TECHNOLOGY AND MANAGEMENT, 2008, 9 (04) : 373 - 391
  • [7] A KANBAN-BASED SIMULATION STUDY OF A MIXED-MODEL JUST-IN-TIME MANUFACTURING LINE
    YAVUZ, IH
    SATIR, A
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (04) : 1027 - 1048
  • [8] Routing with early ordering for just-in-time manufacturing systems
    Jin, MZ
    Liu, K
    Eksioglu, B
    [J]. COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 3, 2006, 3982 : 748 - 756
  • [9] Just-in-Time Manufacturing Systems, Subcontracting and Geographic Proximity
    Holl, Adelheid
    Pardo, Rafael
    Rama, Ruth
    [J]. REGIONAL STUDIES, 2010, 44 (05) : 519 - 533
  • [10] Optimization and analysis of Mizusumashi systems as just-in-time manufacturing
    Takakuwa, S.
    Nomura, J.
    [J]. ANNALS OF DAAAM FOR 2003 & PROCEEDINGS OF THE 14TH INTERNATIONAL DAAAM SYMPOSIUM: INTELLIGENT MANUFACTURING & AUTOMATION: FOCUS ON RECONSTRUCTION AND DEVELOPMENT, 2003, : 461 - 462