共 50 条
- [21] BUILD SEQUENCE SCHEDULING TO MINIMIZE COMPLEXITY IN MIXED-MODEL ASSEMBLY LINES [J]. PROCEEDINGS OF THE 9TH BIENNIAL CONFERENCE ON ENGINEERING SYSTEMS DESIGN AND ANALYSIS - 2008, VOL 4, 2009, : 491 - 499
- [23] Parallel optimization of the balancing and sequencing for mixed-model assembly lines [J]. Manufacturing Technology, 2019, 19 (03): : 537 - 544
- [24] Sequencing the mixed-model assembly line to minimize the total utility and idle costs with variable launching interval [J]. The International Journal of Advanced Manufacturing Technology, 2009, 45 : 987 - 998
- [25] Sequencing the mixed-model assembly line to minimize the total utility and idle costs with variable launching interval [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (9-10): : 987 - 998
- [27] SEQUENCING METHOD CONSIDERING PICKING EFFICIENCY FOR MIXED-MODEL ASSEMBLY LINES WITH SET PARTS SUPPLY SYSTEM [J]. ICIM'2016: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2016, : 9 - 14
- [30] Mixed-model assembly line sequencing at Hyundai Motor Company [J]. Production and Inventory Management Journal, 37 (03): : 20 - 26