BUILD SEQUENCE SCHEDULING TO MINIMIZE COMPLEXITY IN MIXED-MODEL ASSEMBLY LINES

被引:0
|
作者
Zhu, Xiaowei [1 ]
Wang, Hui [1 ]
Hu, S. Jack [1 ]
Koren, Yoram [1 ]
机构
[1] Univ Michigan, Dept Mech Engn, Ann Arbor, MI 48109 USA
关键词
PRODUCT VARIETY; ALGORITHM; SYSTEMS;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Build sequence scheduling is an important topic in mixed-model production. It is to determine the order of products being built in the assembly line. Significant research has been conducted to determine good sequences based on various criteria. For example, in Just-In-Time production systems, optimal sequences are searched to minimize the variation in the rate at which different parts were consumed. This paper discusses the selection of optimal build sequences based on compiexity introduced by product variety in mixed-model assembly line. The complexity was defined as the information entropy that operator processes during assembly, which indirectly measures the human performance in making choices, such as selecting parts, tools, fixtures, and assembly procedures in a multi-product, multi-stage, manual assembly environment. In an earlier paper by the authors, a simple version of complexity measure has been developed for i.i.d. (independent identically distributed) sequences. This paper extends the concept and takes into account the sequential dependence of the choices and its impact on build sequence schedules. A model based on Hidden Markov Chain is proposed to model the sequence scheduling problem with the constraints by spacing rules. Methodologies developed in this paper enhance the previous work on modeling complexity, and provide solution strategies for build sequence scheduling to minimize complexity.
引用
收藏
页码:491 / 499
页数:9
相关论文
共 50 条
  • [1] Sequence planning to minimize complexity in mixed-model assembly lines
    Zhu, Xiaowei
    Hu, S. Jack
    Koren, Yoram
    Marin, Samuel P.
    Huang, Ningjian
    [J]. 2007 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND MANUFACTURING, 2007, : 251 - +
  • [2] A complexity model for sequence planning in mixed-model assembly lines
    Zhu, Xiaowei
    Hu, S. Jack
    Koren, Yoram
    Huang, Ningjian
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (02) : 121 - 130
  • [3] Modeling of Manufacturing Complexity in Mixed-Model Assembly Lines
    Zhu, Xiaowei
    Hu, S. Jack
    Karen, Yoram
    Marin, Samue P.
    [J]. JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2008, 130 (05): : 0510131 - 05101310
  • [4] Scheduling Utility Workers at Mixed-Model Assembly Lines
    Gujjula, Rico
    Guenther, Hans-Otto
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1092 - 1096
  • [5] Sequencing mixed-model assembly lines to minimize part inventory cost
    Nils Boysen
    Malte Fliedner
    Armin Scholl
    [J]. OR Spectrum, 2008, 30 : 611 - 633
  • [6] Sequencing mixed-model assembly lines to minimize part inventory cost
    Boysen, Nils
    Fliedner, Malte
    Scholl, Armin
    [J]. OR SPECTRUM, 2008, 30 (03) : 611 - 633
  • [7] Scheduling mixed-model final assembly lines in JIT manufacturing
    Mohammadi, G.
    Ozbayrak, M.
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2006, 19 (04) : 377 - 382
  • [8] An optimization model for material supply scheduling at mixed-model assembly lines
    Fathi, Masood
    Syberfeldt, Anna
    Ghobakhloo, Morteza
    Eskandari, Hamidreza
    [J]. 51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2018, 72 : 1258 - 1263
  • [9] A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines
    Aigbedo, H
    Monden, Y
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (09) : 2543 - 2564
  • [10] PRODUCT FAMILY DESIGN TO MINIMIZE MANUFACTURING COMPLEXITY IN MIXED-MODEL ASSEMBLY SYSTEMS
    Wang, He
    Zhu, Xiaowei
    Hu, S. Jack
    Lin, Zhongqin
    Chen, Guanlong
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, VOL 2, 2009, : 525 - 534