Evaluating operations flexibility in industrial supply chains to support build-to-order initiatives

被引:15
|
作者
Coronado, Adrian E. M. [1 ]
Lyons, Andrew C. [1 ]
机构
[1] Univ Liverpool, Management Sch, Liverpool, Merseyside, England
关键词
Supply chain management; Flexible organizations; Operations management;
D O I
10.1108/14637150710763586
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose - This paper seeks to evaluate the implications of operations flexibility in industrial supply chains and the effect it has on supporting initiatives designed for build-to-order (BTO) manufacturing. Design/methodology/approach - An industrial case study is used to investigate operations flexibility and its impact on industrial supply chains. Tools used in the analysis include value stream mapping (VSM) and a scorecard for performance measurement. The scorecard tool comprises daily utilisation figures, product demand and responsiveness measures such as supply chain cycle times and pipeline inventory. Findings - The results of the analysis confirm that supply chain VSM and scorecarding are effective tools that can be used to measure the performance of supply chains through the identification of inefficiencies associated with supply chain integration/design. The analysis shows the duration of value-adding and non-value adding activities in the entire chain. Also, the analysis has revealed the close relationship between operations flexibility and the supply chain flexibility dimensions of people and information systems. Research limitations/implications - The research presented analyses the operations and the supply chain of one industrial case study. The analysis does not cover the life cycle of the products mentioned in the study. Practical implications - The study addresses the need, in the manufacturing industry, for tools that can be used in the analysis of manufacturing operations and supply chains, ultimately providing guidelines that can be used in the design of policies focused on performance improvement. Originality/value - BTO initiatives are growing in importance in the manufacturing industry. The flexibility of operations and the supply chain are closely related to the concept of BTO in manufacturing.
引用
收藏
页码:572 / 587
页数:16
相关论文
共 50 条
  • [21] Build-to-order supply chain network design under supply and demand uncertainties
    Lin, Cheng-Chang
    Wang, Tsai-Hsin
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2011, 45 (08) : 1162 - 1176
  • [22] Build-to-Order: Die Verbindung zwischen Mass- und Massenherstellung: Build-to-order Supply Chain Prozesse fur variantenreiche Produkte
    Becker, T.
    VDI Berichte, 2001, (1645): : 341 - 349
  • [23] Build-to-order supply chain management: a literature review and framework for development
    Gunasekaran, A
    Ngai, EWT
    JOURNAL OF OPERATIONS MANAGEMENT, 2005, 23 (05) : 423 - 451
  • [24] Bi-objective Build-to-order Supply Chain Problem with Customer Utility
    Ebrahimi, M.
    Tavakkoli-Moghaddam, R.
    Jolai, F.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2018, 31 (07): : 1066 - 1073
  • [25] Green Virtual Enterprise Broker: Enabling Build-to-Order Supply Chains for Sustainable Customer-Driven Small Series Production
    Romero, David
    Cavalieri, Sergio
    Resta, Barbara
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, APMS 2014, PT II, 2014, 439 : 431 - 441
  • [26] Optimal-Quality Choice and Committed Delivery Time in Build-To-Order Supply Chain
    Wen, Xiaoqin
    Wang, Chenhanzhi
    SUSTAINABILITY, 2022, 14 (18)
  • [27] A robust optimization model for agile and build-to-order supply chain planning under uncertainties
    Morteza Lalmazloumian
    Kuan Yew Wong
    Kannan Govindan
    Devika Kannan
    Annals of Operations Research, 2016, 240 : 435 - 470
  • [28] A robust optimization model for agile and build-to-order supply chain planning under uncertainties
    Lalmazloumian, Morteza
    Wong, Kuan Yew
    Govindan, Kannan
    Kannan, Devika
    ANNALS OF OPERATIONS RESEARCH, 2016, 240 (02) : 435 - 470
  • [29] The build-to-order supply chain (BOSC): a competitive strategy for 21st century
    Gunasekaran, A
    JOURNAL OF OPERATIONS MANAGEMENT, 2005, 23 (05) : 419 - 422
  • [30] A Lagrangian based solution algorithm for a build-to-order supply chain network design problem
    Shi, Jianmai
    Zhang, Guoqing
    Sha, Jichang
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 49 : 21 - 28