Bi-objective Build-to-order Supply Chain Problem with Customer Utility

被引:2
|
作者
Ebrahimi, M. [1 ]
Tavakkoli-Moghaddam, R. [2 ,3 ]
Jolai, F. [2 ]
机构
[1] Univ Tehran, Dept Ind Engn, Albourz Campus, Tehran, Iran
[2] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
[3] Arts & Metiers Paris Tech, LCFC, Metz, France
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2018年 / 31卷 / 07期
关键词
Build-to-order; Bi-objective Model; Supply Chain; Customer Utility; Multi-objective meta-heuristics;
D O I
10.5829/ije.2018.31.07a.09
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Taking into account competitive markets, manufacturers attend more customer's personalization. Accordingly, build-to-order systems have been given more attention in recent years. In these systems, the customer is a very important asset for us and has been paid less attention in the previous studies. This paper introduces a new build-to-order problem in the supply chain. This study focuses on both manufacturer's profit and customer's utility simultaneously where demand is dependent on customer's utility. The customer's utility is a behavior based upon utility function that depends on quality and price and customer's preferences. The new bi-objective non-linear problem is a multi-period, multi-product and three-echelon supply chain in order to increase manufacturer's profit and customer's utility simultaneously. Solving the complicated problem, two multi-objective meta-heuristics, namely non-dominated ranked genetic algorithm (NRGA) and non-dominated sorting genetic algorithm (NSGA-II), were used to solve the given problem. Finally, the outcomes obtained by these meta-heuristics are analyzed
引用
收藏
页码:1066 / 1073
页数:8
相关论文
共 50 条