Identifying key performance indicators for use in control of pre-project stage process in construction

被引:28
|
作者
Haponava, Tatsiana [1 ]
Al-Jibouri, Saad [1 ]
机构
[1] Univ Twente, Civil Engn Dept, Enschede, Netherlands
关键词
Construction industry; Construction operations; Performance management; Performance measures; Project planning;
D O I
10.1108/17410400910928743
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The need for measuring construction project performance has led to development and implementation of various key performance indicators (KPIs). This paper aims to present and discuss the results of a pilot study and interviews to identify process-based KPIs for use in control of the pre-project stage. Design/methodology/approach - Initially, the process of the pre-project stage was mapped to define its main generic sub-processes and outputs based on the literature review. The process map was then verified through a pilot study. Based on the verified sub-processes, a number of process-based KPIs were identified and later validated by experts during the interviews. Findings - As a consequence of the refinement process due to the results of the pilot study and the interviews, the process-based KPIs for the pre-project stage were identified and the main issues they have to encompass were discussed. Originality/value - The identified KPIs offer a significant step towards process control within the pre-project stage. They provide a basis for further development to improve process transparency and to explain the relationships between the various sub-processes.
引用
收藏
页码:160 / 173
页数:14
相关论文
共 50 条
  • [31] Use of key performance indicators in production management
    Jovan, Vladimir
    Zorzut, Sebastjan
    [J]. 2006 IEEE CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2006, : 689 - +
  • [32] Use of key performance indicators in histological dissection
    Griffiths, Matthew
    Gillibrand, Rachel
    [J]. JOURNAL OF CLINICAL PATHOLOGY, 2017, 70 (12) : 1019 - 1023
  • [33] Critical audit indicators for assessing construction projects performance (CPP) at pre-contract stage in Tanzania
    Aloyce, Deogratias
    Monko, Rehema J.
    Luvara, Valentine G. M.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (05) : 530 - 539
  • [34] Key Performance Indicators Relevant Fault Diagnosis and Process Control Approaches for Industrial Applications
    Yin, Shen
    Wang, Yongqiang
    Wang, Guang
    Khan, Abdul-Qayyum
    Haghani, Adel
    [J]. JOURNAL OF CONTROL SCIENCE AND ENGINEERING, 2018, 2018
  • [35] Identifying stakeholders and key performance indicators for district and building energy performance analysis
    Li, Yehong
    O'Donnell, James
    Garcia-Castro, Raul
    Vega-Sanchez, Sergio
    [J]. ENERGY AND BUILDINGS, 2017, 155 : 1 - 15
  • [36] Identifying the performance areas affecting the project performance for Indian construction projects
    Ingle, Prachi Vinod
    Mahesh, Gangadhar
    Deepak, M. D.
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (01) : 1 - 20
  • [37] Tingzikou key water control project started construction
    Liu Chunsheng
    [J]. Electricity, 2010, 21 (01) : 8 - 8
  • [38] Construction Projects' Key Performance Indicators: A Case of the South African Construction Industry
    Sibiya, Mandisa
    Aigbavboa, Clinton
    Thwala, Wellington
    [J]. ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 954 - 960
  • [39] Neutrosophic interrelationship of Key Performance Indicators in an accounting process
    Lara, Angélica Dora Rodríguez
    Tello, Cristhina Pamela Rendón
    Blacio, Jorge Almeida
    Guevara, Richard Hurtado
    [J]. Lara, Angélica Dora Rodríguez, 1600, University of New Mexico (34): : 110 - 116
  • [40] Neutrosophic interrelationship of Key Performance Indicators in an accounting process
    Rodriguez Lara, Angelica Dora
    Rendon Tello, Cristhina Pamela
    Almeida Blacio, Jorge
    Hurtado Guevara, Richard
    [J]. NEUTROSOPHIC SETS AND SYSTEMS, 2020, 34 : 110 - 116