Identifying key performance indicators for use in control of pre-project stage process in construction

被引:28
|
作者
Haponava, Tatsiana [1 ]
Al-Jibouri, Saad [1 ]
机构
[1] Univ Twente, Civil Engn Dept, Enschede, Netherlands
关键词
Construction industry; Construction operations; Performance management; Performance measures; Project planning;
D O I
10.1108/17410400910928743
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The need for measuring construction project performance has led to development and implementation of various key performance indicators (KPIs). This paper aims to present and discuss the results of a pilot study and interviews to identify process-based KPIs for use in control of the pre-project stage. Design/methodology/approach - Initially, the process of the pre-project stage was mapped to define its main generic sub-processes and outputs based on the literature review. The process map was then verified through a pilot study. Based on the verified sub-processes, a number of process-based KPIs were identified and later validated by experts during the interviews. Findings - As a consequence of the refinement process due to the results of the pilot study and the interviews, the process-based KPIs for the pre-project stage were identified and the main issues they have to encompass were discussed. Originality/value - The identified KPIs offer a significant step towards process control within the pre-project stage. They provide a basis for further development to improve process transparency and to explain the relationships between the various sub-processes.
引用
收藏
页码:160 / 173
页数:14
相关论文
共 50 条
  • [21] PRE-PROJECT INVESTIGATION OF A SCIENTIFIC AND TECHNICAL-INFORMATION ORGAN FOR DEVELOPING A CONTROL-SYSTEM
    MOZDOR, SV
    [J]. NAUCHNO-TEKHNICHESKAYA INFORMATSIYA SERIYA 1-ORGANIZATSIYA I METODIKA INFORMATSIONNOI RABOTY, 1981, (05): : 16 - 22
  • [22] Universal key performance indicators for process plants
    Lang, L
    Gerry, J
    [J]. HYDROCARBON PROCESSING, 2005, 84 (06): : 83 - 85
  • [23] Automating the construction of supply chain key performance indicators
    Gulledge, Thomas
    Chavusholu, Tamer
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2008, 108 (5-6) : 750 - 774
  • [24] Management's perception of key performance indicators for construction
    Cox, RF
    Issa, RRA
    Ahrens, D
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (02): : 142 - 151
  • [25] Impact of enterprise information systems on selected key performance indicators in construction project management: An empirical study
    Mesaros, Peter
    Behunova, Annamaria
    Mandicak, Tomas
    Behun, Marcel
    Krajnikova, Katarina
    [J]. WIRELESS NETWORKS, 2021, 27 (03) : 1641 - 1648
  • [26] Impact of enterprise information systems on selected key performance indicators in construction project management: An empirical study
    Peter Mesároš
    Annamária Behúnová
    Tomáš Mandičák
    Marcel Behún
    Katarína Krajníková
    [J]. Wireless Networks, 2021, 27 : 1641 - 1648
  • [27] Bridging the Gap to Success: Developing Accelerated Bridge Construction (ABC) Success Index Tool for Pre-Project Planning
    Pradhananga, Piyush
    ElZomor, Mohamed
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 455 - 465
  • [28] Development of Key Performance Indicators for Performance Assessment of Owners' Project Managers
    Kumar, Shantanu
    Mehany, Mohammed S. Hashem M.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 954 - 963
  • [29] Influence of process performance during the construction stage on achieving end-project goals
    Haponava, Tatsiana
    Al-Jibouri, Saad
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (08) : 853 - 869
  • [30] Use of key performance indicators in histological dissection
    Griffiths, Matthew
    Gillibrand, Rachel
    [J]. JOURNAL OF CLINICAL PATHOLOGY, 2017, 70 (12) : 1019 - 1023