CAPACITATED LOT SIZING WITH SETUP TIMES

被引:264
|
作者
TRIGEIRO, WW
THOMAS, LJ
MCCLAIN, JO
机构
[1] SYST & TECHNOL RES,RESTON,VA 22091
[2] CORNELL UNIV,JOHNSON GRAD SCH MANAGEMENT,ITHACA,NY 14853
关键词
D O I
10.1287/mnsc.35.3.353
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:353 / 366
页数:14
相关论文
共 50 条
  • [41] Lot sizing with non-zero setup times for rework
    Rasoul Haji
    Alireza Haji
    Mehdi Sajadifar
    Saeed Zolfaghari
    Journal of Systems Science and Systems Engineering, 2008, 17 : 230 - 240
  • [42] Lagrangean relaxation based heuristics for lot sizing with setup times
    Sural, Haldun
    Denizel, Meltem
    Van Wassenhove, Luk N.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (01) : 51 - 63
  • [43] Lot sizing with non-zero setup times for rework
    Haji, Alireza
    Haji, Rasoul
    Sajadifar, S. M.
    2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2006, : 267 - 271
  • [44] Lot sizing with non-zero setup times for rework
    Haji, Rasoul
    Haji, Alireza
    Sajadifar, Mehdi
    Zolfaghari, Saeed
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2008, 17 (02) : 230 - 240
  • [45] A new dantzig-wolfe reformulation and branch-and-price algorithm for the capacitated lot-sizing problem with setup times
    Degraeve, Zeger
    Jans, Raf
    OPERATIONS RESEARCH, 2007, 55 (05) : 909 - 920
  • [46] MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
    Absi, Nabil
    Kedad-Sidhoum, Safia
    RAIRO-OPERATIONS RESEARCH, 2007, 41 (02) : 171 - 192
  • [47] A cross entropy-Lagrangean hybrid algorithm for the multi-item capacitated lot-sizing problem with setup times
    Caserta, M.
    Quinonez Rico, E.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (02) : 530 - 548
  • [48] A Solution to the Capacitated Lot Sizing Problem
    Zhang, Zhicong
    Wang, Weiping
    Zhong, Shouyan
    Hu, Kaishun
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 555 - 559
  • [49] Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows
    Stadtler, H
    OPERATIONS RESEARCH, 2003, 51 (03) : 487 - 502
  • [50] FACETS AND ALGORITHMS FOR CAPACITATED LOT SIZING
    LEUNG, JMY
    MAGNANTI, TL
    VACHANI, R
    MATHEMATICAL PROGRAMMING, 1989, 45 (02) : 331 - 359