Lot sizing with non-zero setup times for rework

被引:0
|
作者
Haji, Alireza [1 ]
Haji, Rasoul [1 ]
Sajadifar, S. M. [1 ]
机构
[1] Sharif Univ Technol, IE Dept, Tehran, Iran
来源
2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS | 2006年
关键词
inventory control; rework; lot scheduling; production control;
D O I
10.1109/ICSSSM.2006.320624
中图分类号
F [经济];
学科分类号
02 ;
摘要
In this paper we consider a single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. In each cycle after the normal production of each product the machine is setup for the rework of the defectives of the same product and then the rework process starts. We assume that the setup time for the normal production process as well as the rework process is non-zero. This paper has two objectives. The first objective is to obtain the economic batch quantity (EBQ) for a single product. The second objective is to extend the result of the first objective to the multi-product case. Adopting the common cycle scheduling policy we obtain optimal batch sizes for each product such that the total cost of the system per unit time is minimized.
引用
收藏
页码:267 / 271
页数:5
相关论文
共 50 条
  • [1] LOT SIZING WITH NON-ZERO SETUP TIMES FOR REWORK
    Rasoul HAJI
    Alireza HAJI
    Mehdi SAJADIFAR
    Saeed ZOLFAGHARI
    JournalofSystemsScienceandSystemsEngineering, 2008, (02) : 230 - 240
  • [2] Lot sizing with non-zero setup times for rework
    Rasoul Haji
    Alireza Haji
    Mehdi Sajadifar
    Saeed Zolfaghari
    Journal of Systems Science and Systems Engineering, 2008, 17 : 230 - 240
  • [3] Lot sizing with non-zero setup times for rework
    Haji, Rasoul
    Haji, Alireza
    Sajadifar, Mehdi
    Zolfaghari, Saeed
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2008, 17 (02) : 230 - 240
  • [4] Some Observations to: Lot Sizing with Non-zero Setup Times for Rework
    Nobil A.H.
    Nobil E.
    Cárdenas-Barrón L.E.
    International Journal of Applied and Computational Mathematics, 2017, 3 (Suppl 1) : 1511 - 1517
  • [5] Optimal Batch Production with Rework and Non-Zero Setup Cost for Rework
    Haji, Babak
    Haji, Rasoul
    Haji, Alireza
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 857 - 862
  • [6] CAPACITATED LOT SIZING WITH SETUP TIMES
    TRIGEIRO, WW
    THOMAS, LJ
    MCCLAIN, JO
    MANAGEMENT SCIENCE, 1989, 35 (03) : 353 - 366
  • [7] A SIMPLE HEURISTIC FOR LOT SIZING WITH SETUP TIMES
    TRIGEIRO, WW
    DECISION SCIENCES, 1989, 20 (02) : 294 - 303
  • [8] Lot-sizing scheduling with batch setup times
    Bo Chen
    Yinyu Ye
    Jiawei Zhang
    Journal of Scheduling, 2006, 9 : 299 - 310
  • [9] Lot-sizing scheduling with batch setup times
    Chen, B
    Ye, YY
    Zhang, JW
    JOURNAL OF SCHEDULING, 2006, 9 (03) : 299 - 310
  • [10] ON THE JOINT LOT-SIZING PROBLEM WITH ZERO SETUP COSTS
    ERENGUC, SS
    MERCAN, HM
    DECISION SCIENCES, 1989, 20 (04) : 669 - 676