共 50 条
- [2] Lot sizing with non-zero setup times for rework Journal of Systems Science and Systems Engineering, 2008, 17 : 230 - 240
- [5] Optimal Batch Production with Rework and Non-Zero Setup Cost for Rework CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 857 - 862