共 50 条
- [21] TOTAL BAR AND ROD ROLLING INFORMATION-SYSTEM AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP .2. THE APPLICATION OF A VOICE INPUT TERMINAL TO MIZUSHIMA BAR AND ROD MILL [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S306 - S306
- [22] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI-STEEL-CORP .1. HIGH-PERFORMANCE CONTINUOUS REHEATING FURNACE IN CHIBA PLATE MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1181 - 1181
- [23] CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT EQUIPMENT [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S213 - S213
- [24] FURNACE COMPUTER CONTROL .3. FURNACE COMPUTER CONTROL OF BAR AND ROD MILL AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1184 - 1184
- [26] TECHNICAL DEVELOPMENT IN CONTINUOUS ANNEALING LINE AT MIZUSHIMA WORKS .2. METALLURGY ON PRODUCING OF COLD STRIP IN MIZUSHIMA CONTINUOUS ANNEALING LINE, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1471 - 1471
- [27] ADVANCED AUTOMATION ON THE NEW PLATE MILL AT MIZUSHIMA WORKS. [J]. Iron and Steel Engineer, 1978, 55 (10): : 34 - 40
- [28] THE RESULTS OF IMPROVEMENT IN THE SLAB CASTERS IN NO-2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .3. IMPROVEMENT OF TUNDISH SERVICE YARD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S155 - S155