The accuracy of risk-based cost estimation for water infrastructure projects: preliminary evidence from Australian projects

被引:25
|
作者
Liu, Li [1 ]
Napier, Zigrid [2 ]
机构
[1] Univ Sydney, Dept Civil Engn, Civil Engn Bldg J05, Sydney, NSW 2006, Australia
[2] Evans & Peck, Sydney, NSW, Australia
关键词
Cost estimating; forecasting; accuracy; risk-based estimating; fixed contingency approach;
D O I
10.1080/01446190903431525
中图分类号
F [经济];
学科分类号
02 ;
摘要
Infrastructure projects are still being plagued by cost overruns, delays and revenue shortfalls despite decades of practice and research. Risk-based estimating (RBE) is growing in popularity and has the potential to overcome the two main cost overrun factors-optimistic bias and strategic misrepresentation. Yet, little is known about the accuracy of RBE and its performance drivers. A comparison of water projects using RBE with a sample of construction projects using the conventional estimating approach shows that the projects estimated using RBE have better estimation accuracy than those estimated using more conventional approaches. In addition, the projects using RBE appear more likely to be under-budget while the ones using the conventional approach appear more likely to be over-budget. Further, through interviews and observations of the RBE process, three main performance drivers for the RBE method were identified to include outside view/collective experience, attention focusing and probabilistic, bottom-up modelling.
引用
收藏
页码:89 / 100
页数:12
相关论文
共 50 条
  • [31] Making a risk-based bid decision for overseas construction projects
    Han, S.H.
    Diekmann, J.E.
    2001, Routledge (19)
  • [32] Preliminary Cost Estimation of Highway Projects Using Statistical Learning Methods
    Zhang, Yuanxin
    Minchin Jr, R. Edward
    Flood, Ian
    Ries, Robert J.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (05)
  • [33] Preliminary Engineering Cost-Estimation Strategy Assessment for Roadway Projects
    Liu, Min
    Rasdorf, William
    Hummer, Joseph E.
    Hollar, Donna A.
    Parikh, Shalin C.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (02) : 150 - 157
  • [34] Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
    Mohammad Mohammadi
    Johan Spross
    Håkan Stille
    Geotechnical and Geological Engineering, 2024, 42 (2) : 1445 - 1457
  • [35] Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
    Mohammadi, Mohammad
    Spross, Johan
    Stille, Hakan
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (02) : 1445 - 1457
  • [36] Application of probabilistic cost and schedule risk assessment and risk management to large infrastructure projects
    McGrath, T. C.
    Roberds, W. J.
    Keizur, A. E.
    del Olmo, A. Gutierrez
    Barbato, I.
    SAFETY AND RELIABILITY FOR MANAGING RISK, VOLS 1-3, 2006, : 2093 - +
  • [37] Activity based risk assessment and safety cost estimation for residential building construction projects
    Gurcanli, G. Emre
    Bilir, Senem
    Sevim, Merve
    SAFETY SCIENCE, 2015, 80 : 1 - 12
  • [38] A knowledge-based risk mapping tool for cost estimation of international construction projects
    Yildiz, Acelya Ecem
    Dikmen, Irem
    Birgonul, M. Talat
    Ercoskun, Kerem
    Alten, Selcuk
    AUTOMATION IN CONSTRUCTION, 2014, 43 : 144 - 155
  • [39] The development of a new cost-risk estimating process for transportation infrastructure projects
    Reilly, John
    McBride, Michael
    Sangrey, Dwight
    MacDonald, Douglas
    Brown, Jennifer
    Civil Engineering Practice, 2004, 19 (01): : 53 - 75
  • [40] Risk Assessment in Sustainable Infrastructure Development Projects: A Tool for Mitigating Cost Overruns
    Canesi, Rubina
    Gallo, Beatrice
    LAND, 2024, 13 (01)