共 45 条
- [1] THE OUTLINE OF NO-2 CONTINUOUS GALVANIZING LINE AT KASHIMA WORKS [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1994, 91 (04): : 575 - 580
- [2] CHARACTERISTICS AND OPERATION OF NO 6 PICKLING LINE AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1191 - 1191
- [3] Startup of the revamped No.2 continuous annealing line of Kawasaki Steel at Chiba [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2001, 98 (04): : 391 - 398
- [5] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S798 - S798
- [6] INTEGRATED OPERATION SYSTEM OF COKEMAKING PROCESS AT CHIBA WORKS OF KAWASAKI-STEEL-CORP [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1989, 86 (09): : 675 - 685
- [8] APPLICATION OF REDUCING FLAME ATMOSPHERE IN FUKUYAMA NO-2 CONTINUOUS GALVANIZING LINE [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1993, 79 (02): : T25 - T28
- [9] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .1. MODIFICATION AND OPERATION OF REHEATING FURNACE AT NO 2 HOT STRIP MILL IN CHIBA WORKS, KAWASAKI STEEL CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1196 - 1196
- [10] ENERGY SAVING OPERATION IN SINTER PLANT OF CHIBA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S837 - S837