Factors Influencing the Delay of Road Construction Projects in Northern Mindanao, Philippines

被引:0
|
作者
Cabahug, Ruel R. [1 ]
Arquita, Mariell B. [1 ]
De La Torre, Sheena Marie E. [1 ]
Valledor, Michelle S. [1 ]
Olivares, Shiela Mae D. [1 ]
机构
[1] Univ Sci & Technol Southern Philippines Cagayan d, Coll Engn & Architecture, Cagayan De Oro 9000, Philippines
关键词
delay; road construction; DPWH; factors of delay;
D O I
暂无
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Delayed construction project implementation is one of the most common problems that the government experiences all the time. With so many factors attributed in causing delayed infrastructure projects, there is a need to determine the most prevalent causes of the delay in project completion. This study evaluates the factors influencing the delay of road construction projects supervised by the Department of Public Works and Highways (DPWH) in Northern Mindanao. A total number of 139 completed road projects during year 2016 with 25 contractors were evaluated. Findings revealed that there were four factors that caused the delay of road construction projects; these are (1) road right of way, (2) change in quantity, (3) peace and order and (4) heavy rain.
引用
收藏
页码:187 / 197
页数:11
相关论文
共 50 条
  • [21] An exploration into cost-influencing factors on construction projects
    Cheng, Ying-Mei
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 850 - 860
  • [22] A review of soils and crops in the Bukidnon Highlands of Northern Mindanao, the Philippines
    Dejarme-Calalang, Guadalupe M.
    Colinet, Gilles
    [J]. BIOTECHNOLOGIE AGRONOMIE SOCIETE ET ENVIRONNEMENT, 2014, 18 (04): : 544 - 557
  • [23] The Spirituality of Effective Public School Principals in Northern Mindanao, Philippines
    Tantoco, Fr. Nelson C.
    [J]. ADVANCED SCIENCE LETTERS, 2018, 24 (11) : 8003 - 8006
  • [24] Economic and Time Risk Factors Influencing the Construction Projects: A Case Study of Lebanese Construction Projects
    Ahmad, Omar
    Nouban, Fatemeh
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (03) : 399 - 407
  • [25] Delay factors in the construction of irrigation and hydropower projects in Vietnam
    Nguyen, Van Son
    Nguyen, Huu-Hue
    Nguyen, Duc Anh
    Hai, Dinh Tuan
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 5 - 20
  • [26] The top 10 universal delay factors in construction projects
    Zidane, Youcef J. -T.
    Andersen, Bjorn
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2018, 11 (03) : 650 - 672
  • [27] On the delay factors of the private construction projects in Medan city
    Tarigan, A. Perwira Mulia
    Subroto
    [J]. FRIENDLY CITY 4 FROM RESEARCH TO IMPLEMENTATION FOR BETTER SUSTAINABILITY, 2018, 126
  • [28] DEMOGRAPHIC AND CONTRACEPTIVE PATTERNS AMONG WOMEN IN NORTHERN MINDANAO, THE PHILIPPINES
    TAN, CE
    BALLWEG, JA
    [J]. SOCIAL BIOLOGY, 1984, 31 (3-4): : 232 - 242
  • [29] Perceived economic factors influencing the sustainability of integrated coastal management projects in the Philippines
    Pomeroy, RS
    Oracion, EG
    Pollnac, RB
    Caballes, DA
    [J]. OCEAN & COASTAL MANAGEMENT, 2005, 48 (3-6) : 360 - 377
  • [30] Factors Influencing Transaction Costs in Construction Projects: A Critical Review
    Jin, Xiao-Hua
    Zhang, Guomin
    Ke, Yongjian
    Xia, Bo
    [J]. PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 949 - 958