The top 10 universal delay factors in construction projects

被引:96
|
作者
Zidane, Youcef J. -T. [1 ]
Andersen, Bjorn [2 ]
机构
[1] Norges Tekn Nat Vitenskapelige Univ, Dept Mech & Ind Engn, Trondheim, Norway
[2] Norges Tekn Nat Vitenskapelige Univ, Dept Prod & Qual Technol, Trondheim, Norway
关键词
Norway; Construction projects; Delay causes; Delay factors; Top; 10; Universal; SYSTEMATIC REVIEWS; COST ESCALATION; TIME; OVERRUNS; PERFORMANCE; RANKING;
D O I
10.1108/IJMPB-05-2017-0052
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose Projects often face delays and unnecessary use of time due to various factors and reasons, and hence suffer from unfavourable consequences. The purpose of this paper is to identify the universal delay factors from an intensive literature review, complemented by delay factors in major Norwegian construction projects based on empirical data. Design/methodology/approach The study in which this paper is based includes an intensive literature review, and semi-quantitative open survey questionnaires. This paper addresses frequency and type of delay factors in construction projects, in Norway based on the survey, and worldwide based on the previous studies. Findings From the study, the causes of delays facing the Norwegian construction industry are: poor planning and scheduling; slow/poor decision-making process; internal administrative procedures and bureaucracy within project organisations; resources shortage (human resources, machinery, equipment); poor communication and coordination between parties; slow quality inspection process of the completed work; design changes during construction/change orders; sponsor/owner/client lack of commitment and/or clear demands (goals and objectives); late/slow/incomplete/improper design; office issues; and users' issues. And the top 10 universal delay factors are: design changes during construction/change orders; delays in payment of contractor(s); poor planning and scheduling; poor site management and supervision; incomplete or improper design; inadequate contractor experience/building methods and approaches; contractor's financial difficulties; sponsor/owner/client's financial difficulties; resources shortage (human resources, machinery, equipment); and poor labour productivity and shortage of skills. Research limitations/implications When it comes to the identification of delay factors in major Norwegian projects, the research is based on a sample of 202 respondents from an open survey questionnaire. It should be noted that analysing a large population of respondents that have been asked open questions can be challenging due to the vague findings it might lead to. Also, when it comes to the identification of the universal delay factors, there were different methods used by different authors, within different context. Similar future studies in Norway based on qualitative and quantitative methods will give better verification for the findings. Practical implications This paper has documented the critical delay factors/causes in Norway. The results of this study will help project managers, in Norway and elsewhere, to be aware and know about the potential causes of delay in their construction projects, which will help to identify the possible risks in the early phases of the project. Another practical implication is to make project managers and policy makers conscious that delays are quite universal, making it necessary to identify them as a first step. Social implications The identification of delays factors and causes can permit projects to implement mitigation actions to avoid delays, thus allowing delivering schools, hospitals and other necessary infrastructure on schedule or ahead of schedule to society. Originality/value This paper highlights most (almost all) of the studies in the literature, including to the study done in Norway, concerning the delay factors in construction projects and large construction projects in general. This wide review of relevant literature will save time other academicians from having to conduct similar studies. This study will assist both academic and professional experts providing more insight about the delay causes in large-scale construction projects.
引用
收藏
页码:650 / 672
页数:23
相关论文
共 50 条
  • [1] Delay factors in the construction of irrigation and hydropower projects in Vietnam
    Nguyen, Van Son
    Nguyen, Huu-Hue
    Nguyen, Duc Anh
    Hai, Dinh Tuan
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 5 - 20
  • [2] On the delay factors of the private construction projects in Medan city
    Tarigan, A. Perwira Mulia
    Subroto
    [J]. FRIENDLY CITY 4 FROM RESEARCH TO IMPLEMENTATION FOR BETTER SUSTAINABILITY, 2018, 126
  • [3] Analysing the critical delay factors and delay in material supply for construction projects in India
    Reddy, M. Vidyasagar
    Rao, Hanumantha
    [J]. MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1890 - 1897
  • [4] 10 top projects
    [J]. Aberdeen's Magazine of Masonry Construction, 1998, 11 (04):
  • [5] Extraction of underlying factors causing construction projects delay in Nigeria
    Egwim, Christian Nnaemeka
    Alaka, Hafiz
    Toriola-Coker, Luqman Olalekan
    Balogun, Habeeb
    Ajayi, Saheed
    Oseghale, Raphael
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023, 21 (05) : 1323 - 1342
  • [6] Ranking of delay factors in construction projects after Egyptian revolution
    Aziz, Remon Fayek
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2013, 52 (03) : 387 - 406
  • [7] Revisiting critical delay factors for construction: Analysing projects in Malaysia
    Yap, Jeffrey Boon Hui
    Goay, Pei Ling
    Woon, Yoke Bee
    Skitmore, Martin
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2021, 60 (01) : 1717 - 1729
  • [8] The significant factors causing delay of building construction projects in Malaysia
    Alaghbari, Wa'el
    Kadir, Mohd. Razali A.
    Salim, Azizah
    Ernawati
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) : 192 - +
  • [9] The Investigation of the Role of RFID in Mitigating Delay Factors in Construction Projects
    Azeez, Luqman Ibrahim
    Radmehr, Mehrshad
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2022, 29 (03): : 933 - 942
  • [10] Comparative Analysis of Factors Causing Delay in Residential Construction Projects in Pakistan
    Din, Zia Ud
    Raza, Ali
    Khan, Muhammad Babar
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 640 - 648