共 50 条
- [11] AUTOMATIC GUIDED VEHICLES ... MODERN MATERIAL HANDLING [J]. TEXTILE INDUSTRIES, 1984, 148 (05): : 47 - 48
- [14] Application of simulation to scheduling, sequencing, and material handling [J]. PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE, 1997, : 861 - 865
- [15] Research on Jobshop Scheduling Problem with Energy Consumption [J]. ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-3, 2011, 314-316 : 2071 - 2075
- [16] Material handling: what's available in industrial vehicles [J]. Plant Engineering (Barrington, Illinois), 1997, 51 (01):
- [18] SCHEDULING AND CONTROL OF AGV BASED MATERIAL HANDLING SYSTEMS [J]. IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1992, 3 : 729 - 736
- [19] A Case Study of AGV Scheduling for Production Material Handling [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 2351 - +
- [20] Heuristics for scheduling operations in MRP: Jobshop case [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2005, 12 (04): : 322 - 334