Research on Jobshop Scheduling Problem with Energy Consumption

被引:0
|
作者
Wang, Jiahai [1 ]
Gong, Wentao [1 ]
机构
[1] Tongji Univ, Coll Mech Engn, Shanghai 201804, Peoples R China
来源
关键词
Energy Consumption; !text type='JS']JS[!/text]P; Load Shifting; GA; eM-Plant; Time Division;
D O I
10.4028/www.scientific.net/AMR.314-316.2071
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Discrete machine manufacture enterprises have to induce new low-carbon manufacturing model in order to solve a dilemma of mutual restraint between development and electric energy consumption. The paper presents an approach to solve JSP with the objective of minimizing the energy consumption by shortening the distance between electricity peak and valley according to theory of load shifting in electricity. The mathematical model is proposed for JSP with objective of minimizing the energy consumption and processing time of entire batch, then the idea of time division is introduced, and a solving method based on GA built-in eM-Plant is employed to verify the model and get satisfactory scheduling results.
引用
收藏
页码:2071 / 2075
页数:5
相关论文
共 50 条
  • [1] Dragonfly algorithm for Solving Flexible Jobshop Scheduling Problem
    Yang, Dongsheng
    Wu, Mingliang
    Yang, Zhile
    Guo, Yuanjun
    Feng, Wei
    [J]. 2020 35TH YOUTH ACADEMIC ANNUAL CONFERENCE OF CHINESE ASSOCIATION OF AUTOMATION (YAC), 2020, : 867 - 872
  • [2] Enhancement of Jobshop Scheduling Problem Using Search Optimization
    Viradia, Vinay P.
    Bhatt, Chintan M.
    [J]. 2014 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL INFORMATION AND COMMUNICATION TECHNOLOGY AND IT'S APPLICATIONS (DICTAP), 2014, : 411 - 414
  • [3] Research on Flexible Job Shop Scheduling Problem With Total Energy Consumption Constraint
    Lei D.-M.
    Yang D.-J.
    [J]. Zidonghua Xuebao/Acta Automatica Sinica, 2018, 44 (11): : 2083 - 2091
  • [4] A Chaotic Particle Swarm Optimization Algorithm for the Jobshop Scheduling Problem
    Yan Ping
    Jiao Minghai
    [J]. 2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2014, : 218 - 222
  • [5] MULTICRITERIA JOBSHOP SCHEDULING
    RAMESH, R
    CARY, JM
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1989, 17 : 597 - 602
  • [6] ON THE SCHEDULING OF A JOBSHOP BY SIMULATION
    ELKADEEM, M
    ISSA, SS
    FORS, MN
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1982, 6 (03) : 189 - 189
  • [7] Solution of a flexible jobshop scheduling problem using an Estimation of Distribution Algorithm
    Perez, R.
    Joens, S.
    Hernandez, A.
    [J]. REVISTA IBEROAMERICANA DE AUTOMATICA E INFORMATICA INDUSTRIAL, 2015, 12 (01): : 49 - 57
  • [8] Solving permutation problems with Differential Evolution: An Application to the Jobshop Scheduling Problem
    Ponsich, Antonin
    Castillo Tapia, Ma Guadalupe
    Coello Coello, Carlos A.
    [J]. 2009 9TH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND APPLICATIONS, 2009, : 25 - +
  • [9] A Two-machine Jobshop Scheduling Problem with Convex Processing Times
    Xu, Kailiang
    Luo, Jing
    Sun, Yuchuan
    [J]. PROCEEDINGS OF THE 2018 13TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2018), 2018, : 2769 - 2773
  • [10] Effective Heuristic Algorithms Solving the Jobshop Scheduling Problem with Release Dates
    Ren, Tao
    Zhang, Yan
    Cheng, Shuenn-Ren
    Wu, Chin-Chia
    Zhang, Meng
    Chang, Bo-yu
    Wang, Xin-yue
    Zhao, Peng
    [J]. MATHEMATICS, 2020, 8 (08)